IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

967

matching recommendations
Reset
SIC 3469 Metal Stampings, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0489 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,258 $271 Implemented
WV0489 # 07 Y:2014 07 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,213 $2,425 Implemented
WV0489 # 05 Y:2014 05 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $4,585 $0 Implemented
WV0489 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,622 $6,539 Implemented
WV0489 # 03 Y:2014 03 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,336 $0 Implemented
WV0489 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,418 $17,825 Not Implemented
WV0489 # 01 Y:2014 01 2014 COMBINE UTILITY METERS $19,660 $10,500 Not Implemented
NC0511 # 01 Y:2014 01 2014 ADOPT IN-HOUSE MATERIAL GENERATION $53,232 $125,000 Not Implemented
NC0511 # 02 Y:2014 02 2014 UPGRADE CONTROLS ON COMPRESSORS $29,302 $53,000 Not Implemented
NC0511 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $7,743 $450 Not Implemented
NC0511 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,802 $50 Not Implemented
NC0511 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,307 $5,081 Not Implemented
NC0511 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $11,995 $2,335 Not Implemented
NC0511 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,667 $100 Not Implemented
UK1401 # 01 Y:2014 01 2014 UPGRADE CONTROLS ON COMPRESSORS $13,717 $15,000 Not Implemented
UK1401 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $4,150 $2,500 Not Implemented
UK1401 # 03 Y:2014 03 2014 REPAIR AND ELIMINATE STEAM LEAKS $1,910 $4,165 Not Implemented
UK1401 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,825 $1,500 Not Implemented
UK1401 # 05 Y:2014 05 2014 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $3,001 $2,080 Not Implemented
UK1401 # 06 Y:2014 06 2014 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,590 $7,550 Not Implemented
UK1401 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $2,274 $860 Not Implemented
UK1401 # 08 Y:2014 08 2014 OPTIMIZE PLANT POWER FACTOR $1,337 $2,135 Not Implemented
UK1401 # 09 Y:2014 09 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $689 $840 Not Implemented
UK1401 # 10 Y:2014 10 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,297 $0 Not Implemented
UK1401 # 11 Y:2014 11 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,087 $700 Not Implemented