Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
44
matching recommendationsSIC | 3469 | Metal Stampings, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0464 # 05 Y:2013 | 05 | 2013 | USE PHOTOCELL CONTROLS | $4,384 | $5,920 | Not Implemented |
SD0464 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,852 | $200 | Not Implemented |
SD0464 # 09 Y:2013 | 09 | 2013 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,556 | $500 | Not Implemented |
SD0464 # 08 Y:2013 | 08 | 2013 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,686 | $400 | Not Implemented |
SD0464 # 07 Y:2013 | 07 | 2013 | INSTALL OCCUPANCY SENSORS | $3,360 | $3,887 | Not Implemented |
SD0464 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,189 | $1,500 | Not Implemented |
SD0464 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,360 | $6,450 | Not Implemented |
SD0464 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,895 | $27,250 | Implemented |
SD0464 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,453 | $11,325 | Not Implemented |
LM0029 # 09 Y:2002 | 09 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $165,000 | $350,000 | Not Implemented |
LM0029 # 08 Y:2002 | 08 | 2002 | MODIFY WORKLOAD | $247,361 | $15,000 | Not Implemented |
LM0029 # 07 Y:2002 | 07 | 2002 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $45,000 | $16,500 | Not Implemented |
LM0029 # 06 Y:2002 | 06 | 2002 | DEVELOP STANDARD OPERATING PROCEDURES | $40,500 | $7,960 | Not Implemented |
LM0029 # 05 Y:2002 | 05 | 2002 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $200,000 | $163,000 | Not Implemented |
LM0029 # 04 Y:2002 | 04 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,628 | $700 | Implemented |
LM0029 # 10 Y:2002 | 10 | 2002 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $7,500 | $1,000 | Implemented |
LM0029 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,118 | $500 | Implemented |
LM0029 # 02 Y:2002 | 02 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,200 | $0 | Implemented |
LM0029 # 01 Y:2002 | 01 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $592 | $735 | Implemented |
LM0029 # 11 Y:2002 | 11 | 2002 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $7,500 | $1,000 | Implemented |
LM0023 # 09 Y:2002 | 09 | 2002 | HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME | $47,000 | $2,000 | Not Implemented |
LM0023 # 08 Y:2002 | 08 | 2002 | INSTALL AUTOMATIC PACKING EQUIPMENT | $3,330 | $5,000 | Implemented |
LM0023 # 07 Y:2002 | 07 | 2002 | SCHEDULE DELIVERIES ACCORDING TO DEMAND | $80,000 | $21,770 | Implemented |
LM0023 # 06 Y:2002 | 06 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $17,080 | $3,200 | Implemented |
LM0023 # 05 Y:2002 | 05 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,241 | $650 | Not Implemented |