matching recommendationsSIC | 3469 | Metal Stampings, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0464 # 05 Y:2013 | 05 | 2013 | USE PHOTOCELL CONTROLS | $4,384 | $5,920 | Not Implemented |
SD0464 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,852 | $200 | Not Implemented |
SD0464 # 09 Y:2013 | 09 | 2013 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,556 | $500 | Not Implemented |
SD0464 # 08 Y:2013 | 08 | 2013 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,686 | $400 | Not Implemented |
SD0464 # 07 Y:2013 | 07 | 2013 | INSTALL OCCUPANCY SENSORS | $3,360 | $3,887 | Not Implemented |
SD0464 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,189 | $1,500 | Not Implemented |
SD0464 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,360 | $6,450 | Not Implemented |
SD0464 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,895 | $27,250 | Implemented |
SD0464 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,453 | $11,325 | Not Implemented |
LM0029 # 09 Y:2002 | 09 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $165,000 | $350,000 | Not Implemented |
LM0029 # 08 Y:2002 | 08 | 2002 | MODIFY WORKLOAD | $247,361 | $15,000 | Not Implemented |
LM0029 # 07 Y:2002 | 07 | 2002 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $45,000 | $16,500 | Not Implemented |
LM0029 # 06 Y:2002 | 06 | 2002 | DEVELOP STANDARD OPERATING PROCEDURES | $40,500 | $7,960 | Not Implemented |
LM0029 # 05 Y:2002 | 05 | 2002 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $200,000 | $163,000 | Not Implemented |
LM0029 # 04 Y:2002 | 04 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,628 | $700 | Implemented |
LM0029 # 10 Y:2002 | 10 | 2002 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $7,500 | $1,000 | Implemented |
LM0029 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,118 | $500 | Implemented |
LM0029 # 02 Y:2002 | 02 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,200 | $0 | Implemented |
LM0029 # 01 Y:2002 | 01 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $592 | $735 | Implemented |
LM0029 # 11 Y:2002 | 11 | 2002 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $7,500 | $1,000 | Implemented |
LM0023 # 09 Y:2002 | 09 | 2002 | HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME | $47,000 | $2,000 | Not Implemented |
LM0023 # 08 Y:2002 | 08 | 2002 | INSTALL AUTOMATIC PACKING EQUIPMENT | $3,330 | $5,000 | Implemented |
LM0023 # 07 Y:2002 | 07 | 2002 | SCHEDULE DELIVERIES ACCORDING TO DEMAND | $80,000 | $21,770 | Implemented |
LM0023 # 06 Y:2002 | 06 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $17,080 | $3,200 | Implemented |
LM0023 # 05 Y:2002 | 05 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,241 | $650 | Not Implemented |