IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
SIC 3469 Metal Stampings, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0503 # 05 Y:2021 05 2021 PREHEAT COMBUSTION AIR WITH WASTE HEAT $56,981 $300,000 Implemented
LE0503 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,126 $15,100 Implemented
LE0503 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,254 $17,500 Implemented
LE0503 # 02 Y:2021 02 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,108 $45,000 Implemented
LE0503 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,633 $50,000 Implemented
HO0208 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $2,578 $1,600 n/a
HO0208 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,352 $47,121 n/a
HO0208 # 09 Y:1999 09 1999 CHANGE OPERATING CONDITIONS $5,720 $27,500 n/a
HO0208 # 08 Y:1999 08 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,340 $630 n/a
HO0208 # 07 Y:1999 07 1999 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $4,536 $700 n/a
HO0208 # 06 Y:1999 06 1999 CONDENSE OPERATION INTO ONE BUILDING $3,938 $8,000 n/a
HO0208 # 05 Y:1999 05 1999 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $205 $500 n/a
HO0208 # 04 Y:1999 04 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $610 $0 n/a
HO0208 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $1,190 $800 n/a
RU0124 # 06 Y:1991 06 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,769 $0 Implemented
RU0124 # 05 Y:1991 05 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,108 $500 Implemented
RU0124 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,576 $326 Implemented
RU0124 # 03 Y:1991 03 1991 IMPROVE LUBRICATION PRACTICES $2,430 $800 Implemented
RU0124 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,332 $272 Implemented
RU0124 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,053 $0 Implemented
RU0092 # 05 Y:1990 05 1990 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $546 $1,080 Not Implemented
RU0092 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $332 $0 Not Implemented
RU0092 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,267 $214 Implemented
RU0092 # 02 Y:1990 02 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,505 $500 Implemented
RU0092 # 01 Y:1990 01 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $261 $34 Implemented