Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
46
matching recommendationsSIC | 3469 | Metal Stampings, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0503 # 05 Y:2021 | 05 | 2021 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $56,981 | $300,000 | Implemented |
LE0503 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,126 | $15,100 | Implemented |
LE0503 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,254 | $17,500 | Implemented |
LE0503 # 02 Y:2021 | 02 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $11,108 | $45,000 | Implemented |
LE0503 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,633 | $50,000 | Implemented |
HO0208 # 02 Y:1999 | 02 | 1999 | INSTALL OCCUPANCY SENSORS | $2,578 | $1,600 | n/a |
HO0208 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,352 | $47,121 | n/a |
HO0208 # 09 Y:1999 | 09 | 1999 | CHANGE OPERATING CONDITIONS | $5,720 | $27,500 | n/a |
HO0208 # 08 Y:1999 | 08 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $2,340 | $630 | n/a |
HO0208 # 07 Y:1999 | 07 | 1999 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $4,536 | $700 | n/a |
HO0208 # 06 Y:1999 | 06 | 1999 | CONDENSE OPERATION INTO ONE BUILDING | $3,938 | $8,000 | n/a |
HO0208 # 05 Y:1999 | 05 | 1999 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $205 | $500 | n/a |
HO0208 # 04 Y:1999 | 04 | 1999 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $610 | $0 | n/a |
HO0208 # 03 Y:1999 | 03 | 1999 | INSTALL OCCUPANCY SENSORS | $1,190 | $800 | n/a |
RU0124 # 06 Y:1991 | 06 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,769 | $0 | Implemented |
RU0124 # 05 Y:1991 | 05 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,108 | $500 | Implemented |
RU0124 # 04 Y:1991 | 04 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,576 | $326 | Implemented |
RU0124 # 03 Y:1991 | 03 | 1991 | IMPROVE LUBRICATION PRACTICES | $2,430 | $800 | Implemented |
RU0124 # 02 Y:1991 | 02 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $9,332 | $272 | Implemented |
RU0124 # 01 Y:1991 | 01 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,053 | $0 | Implemented |
RU0092 # 05 Y:1990 | 05 | 1990 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $546 | $1,080 | Not Implemented |
RU0092 # 04 Y:1990 | 04 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $332 | $0 | Not Implemented |
RU0092 # 03 Y:1990 | 03 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,267 | $214 | Implemented |
RU0092 # 02 Y:1990 | 02 | 1990 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,505 | $500 | Implemented |
RU0092 # 01 Y:1990 | 01 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $261 | $34 | Implemented |