Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
45
matching recommendationsSIC | 3469 | Metal Stampings, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MO0286 # 09 Y:2000 | 09 | 2000 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $5,360 | $3,700 | Implemented |
MO0286 # 08 Y:2000 | 08 | 2000 | INSTALL EQUIPMENT TO MOVE PRODUCT | $3,650 | $1,300 | Implemented |
MO0286 # 07 Y:2000 | 07 | 2000 | BURN WASTE OIL FOR HEAT | $3,970 | $3,500 | Not Implemented |
MO0286 # 06 Y:2000 | 06 | 2000 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,040 | $0 | Implemented |
MO0286 # 05 Y:2000 | 05 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $7,535 | $7,500 | Not Implemented |
MO0286 # 04 Y:2000 | 04 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $515 | $0 | Implemented |
MO0286 # 03 Y:2000 | 03 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,722 | $40 | Implemented |
MO0286 # 01 Y:2000 | 01 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,671 | $3,945 | Implemented |
MO0286 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,521 | $118 | Implemented |
CO0465 # 02 Y:2000 | 02 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,190 | $7,500 | Not Implemented |
CO0465 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,540 | $16,000 | Not Implemented |
CO0465 # 08 Y:2000 | 08 | 2000 | EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME | $6,930 | $6,000 | Not Implemented |
CO0465 # 07 Y:2000 | 07 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $280 | $0 | Not Implemented |
CO0465 # 06 Y:2000 | 06 | 2000 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $4,090 | $7,960 | Implemented |
CO0465 # 05 Y:2000 | 05 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $750 | $350 | Implemented |
CO0465 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,350 | $400 | Implemented |
CO0465 # 03 Y:2000 | 03 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,240 | $1,210 | Implemented |
CO0465 # 09 Y:2000 | 09 | 2000 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,460 | $250 | Not Implemented |
WI0376 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,771 | $10,971 | n/a |
WI0376 # 03 Y:2000 | 03 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,131 | $0 | n/a |
WI0376 # 04 Y:2000 | 04 | 2000 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,172 | $100 | n/a |
WI0376 # 05 Y:2000 | 05 | 2000 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $1,954 | $1,000 | n/a |
WI0376 # 06 Y:2000 | 06 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,719 | $4,000 | n/a |
WI0376 # 07 Y:2000 | 07 | 2000 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,375 | $5,600 | n/a |
WI0376 # 08 Y:2000 | 08 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,691 | $2,600 | n/a |