Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 3469 | Metal Stampings, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0660 # 07 Y:2003 | 07 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,568 | $6,545 | Not Implemented |
UD0660 # 20 Y:2003 | 20 | 2003 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $150 | $0 | Implemented |
UD0660 # 19 Y:2003 | 19 | 2003 | INSTALL OCCUPANCY SENSORS | $256 | $167 | Not Implemented |
UD0660 # 18 Y:2003 | 18 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $946 | $2,442 | Not Implemented |
UD0660 # 17 Y:2003 | 17 | 2003 | INSTALL OCCUPANCY SENSORS | $1,080 | $4,200 | Not Implemented |
UD0660 # 16 Y:2003 | 16 | 2003 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $1,260 | $0 | Implemented |
UD0660 # 15 Y:2003 | 15 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,443 | $1,000 | Implemented |
UD0660 # 14 Y:2003 | 14 | 2003 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $1,707 | $0 | Not Implemented |
UD0660 # 13 Y:2003 | 13 | 2003 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $2,019 | $4,158 | Not Implemented |
UD0660 # 12 Y:2003 | 12 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,763 | $3,318 | Implemented |
UD0660 # 11 Y:2003 | 11 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,905 | $7,338 | Not Implemented |
UD0660 # 10 Y:2003 | 10 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,648 | $0 | Not Implemented |
UD0660 # 09 Y:2003 | 09 | 2003 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $3,983 | $14,150 | Not Implemented |
UD0660 # 08 Y:2003 | 08 | 2003 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $5,026 | $8,400 | Implemented |
UD0660 # 06 Y:2003 | 06 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,666 | $1,124 | Not Implemented |
UD0660 # 05 Y:2003 | 05 | 2003 | REDUCE VENTILATION AIR | $8,388 | $15,000 | Implemented |
UD0660 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,291 | $7,000 | Not Implemented |
UD0660 # 03 Y:2003 | 03 | 2003 | FILTER AND REUSE HYDRAULIC OIL | $19,375 | $4,323 | Not Implemented |
UD0660 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $31,779 | $0 | Implemented |
UD0660 # 01 Y:2003 | 01 | 2003 | DEVELOP STANDARD OPERATING PROCEDURES | $280,000 | $58,320 | n/a |
OK0653 # 01 Y:2003 | 01 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,530 | $6,844 | Not Implemented |
OK0653 # 07 Y:2003 | 07 | 2003 | AUTOMATE FINISHING PROCESS | $36,680 | $73,250 | Not Implemented |
OK0653 # 06 Y:2003 | 06 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $25,432 | $4,800 | Not Implemented |
OK0653 # 05 Y:2003 | 05 | 2003 | INSTALL SET-BACK TIMERS | $5,337 | $3,280 | Not Implemented |
OK0653 # 04 Y:2003 | 04 | 2003 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,904 | $13,860 | Not Implemented |