Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,577
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0597 # 09 Y:2020 | 09 | 2020 | INSTALL OCCUPANCY SENSORS | $446 | $1,536 | Implemented |
WV0597 # 10 Y:2020 | 10 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $254 | $191 | Implemented |
CL2008 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,868 | $0 | Implemented |
CL2008 # 02 Y:2020 | 02 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $908 | $4,500 | Not Implemented |
CL2008 # 03 Y:2020 | 03 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,758 | $2,616 | Implemented |
IC0227 # 01 Y:2019 | 01 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,221 | $800 | Not Implemented |
IC0227 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,441 | $1,500 | Not Implemented |
IC0227 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,117 | $7,146 | Not Implemented |
IC0227 # 04 Y:2019 | 04 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,978 | $9,600 | Not Implemented |
IC0227 # 05 Y:2019 | 05 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,871 | $28,000 | Not Implemented |
IC0226 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $919 | $689 | Not Implemented |
IC0226 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,608 | $4,300 | Not Implemented |
IC0226 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,094 | $167 | Not Implemented |
IC0226 # 04 Y:2019 | 04 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $343 | $1,200 | Not Implemented |
IC0226 # 05 Y:2019 | 05 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,367 | $0 | Not Implemented |
IC0226 # 06 Y:2019 | 06 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $650 | $60 | Not Implemented |
UA0217 # 01 Y:2019 | 01 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,041 | $3,585 | Not Implemented |
UA0217 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,933 | $50 | Not Implemented |
UA0217 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,910 | $1,395 | Implemented |
UA0217 # 04 Y:2019 | 04 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $36,500 | $104,362 | Not Implemented |
UA0217 # 05 Y:2019 | 05 | 2019 | INSTALL OCCUPANCY SENSORS | $856 | $922 | Not Implemented |
UA0217 # 06 Y:2019 | 06 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,941 | $50 | Implemented |
UA0217 # 07 Y:2019 | 07 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,995 | $3,320 | Not Implemented |
SU0484 # 01 Y:2019 | 01 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $150 | $14 | Not Implemented |
SU0484 # 02 Y:2019 | 02 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $370 | $157 | Implemented |