Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,577
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0085 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,801 | $8,200 | Implemented |
TT0088 # 01 Y:2012 | 01 | 2012 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $192 | $25 | Not Implemented |
TT0088 # 02 Y:2012 | 02 | 2012 | OPTIMIZE PLANT POWER FACTOR | $1,465 | $3,978 | Not Implemented |
TT0088 # 03 Y:2012 | 03 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $4,506 | $5,300 | Not Implemented |
TT0088 # 04 Y:2012 | 04 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $800 | $850 | Not Implemented |
TT0088 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,989 | $10,200 | Not Implemented |
TT0088 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $626 | $11,880 | Not Implemented |
TT0088 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,346 | $3,350 | Not Implemented |
TT0088 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $77 | $1,014 | Not Implemented |
TT0088 # 09 Y:2012 | 09 | 2012 | METER WASTE WATER | $3,603 | $750 | Not Implemented |
TT0088 # 10 Y:2012 | 10 | 2012 | USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS | $19,167 | $47,935 | Not Implemented |
MA0691 # 01 Y:2012 | 01 | 2012 | REPLACE BOILER | $9,946 | $38,400 | Not Implemented |
MA0691 # 02 Y:2012 | 02 | 2012 | USE MINIMUM SAFE OVEN VENTILATION | $9,618 | $18,525 | Not Implemented |
MA0691 # 03 Y:2012 | 03 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,192 | $42,500 | Not Implemented |
MA0691 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,115 | $19,125 | Not Implemented |
MA0691 # 05 Y:2012 | 05 | 2012 | INSULATE BARE EQUIPMENT | $772 | $1,575 | Implemented |
MA0691 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $249 | $200 | Implemented |
MAS022 # 01 Y:2012 | 01 | 2012 | INSULATE BARE EQUIPMENT | $19,167 | $20,900 | Implemented |
MAS022 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,821 | $2,600 | Implemented |
MAS022 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,186 | $4,660 | Implemented |
MAS022 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $875 | $0 | Implemented |
BD0401 # 01 Y:2011 | 01 | 2011 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $5,625 | $4,500 | Not Implemented |
BD0401 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,618 | $17,144 | Not Implemented |
BD0401 # 03 Y:2011 | 03 | 2011 | INSTALL OCCUPANCY SENSORS | $2,085 | $900 | Not Implemented |
BD0401 # 04 Y:2011 | 04 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,685 | $3,000 | Not Implemented |