Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
154
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0339 # 03 Y:1995 | 03 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $653 | $0 | Implemented |
MA0339 # 04 Y:1995 | 04 | 1995 | INSULATE BARE EQUIPMENT | $504 | $1,010 | Not Implemented |
MA0339 # 05 Y:1995 | 05 | 1995 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $57,939 | $118,450 | Not Implemented |
MA0339 # 06 Y:1995 | 06 | 1995 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $23,990 | $500 | Not Implemented |
MA0339 # 07 Y:1995 | 07 | 1995 | REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS | $824 | $3,000 | Not Implemented |
MA0293 # 01 Y:1994 | 01 | 1994 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $100,844 | $54,704 | Not Implemented |
MA0293 # 02 Y:1994 | 02 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $21,561 | $34,000 | Not Implemented |
MA0293 # 03 Y:1994 | 03 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,149 | $644 | Implemented |
MA0293 # 04 Y:1994 | 04 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $491 | $100 | Implemented |
MA0293 # 05 Y:1994 | 05 | 1994 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,467 | $982 | Implemented |
MA0293 # 06 Y:1994 | 06 | 1994 | INSULATE BARE EQUIPMENT | $1,209 | $334 | Not Implemented |
MA0293 # 07 Y:1994 | 07 | 1994 | INSTALL OCCUPANCY SENSORS | $1,007 | $218 | Not Implemented |
MA0293 # 08 Y:1994 | 08 | 1994 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $769 | $0 | Implemented |
MA0293 # 09 Y:1994 | 09 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $739 | $0 | Implemented |
MA0293 # 10 Y:1994 | 10 | 1994 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $300 | $961 | Not Implemented |
MA0260 # 01 Y:1992 | 01 | 1992 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $10,389 | $0 | Implemented |
MA0260 # 02 Y:1992 | 02 | 1992 | AIR CONDITION ONLY SPACE NECESSARY | $10,704 | $1,000 | Implemented |
MA0260 # 03 Y:1992 | 03 | 1992 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $5,095 | $15,537 | Not Implemented |
MA0260 # 04 Y:1992 | 04 | 1992 | INSTALL TIMERS AND/OR THERMOSTATS | $3,392 | $0 | Implemented |
MA0260 # 05 Y:1992 | 05 | 1992 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,071 | $1,368 | Implemented |
MA0260 # 06 Y:1992 | 06 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $580 | $1 | Implemented |
MA0260 # 07 Y:1992 | 07 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $298 | $54 | Not Implemented |
MA0260 # 08 Y:1992 | 08 | 1992 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $246 | $3,870 | Not Implemented |
MA0194 # 01 Y:1990 | 01 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $503 | $79 | Implemented |
MA0194 # 02 Y:1990 | 02 | 1990 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $25,980 | $38,667 | Implemented |