Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,577
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0697 # 14 Y:2004 | 14 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $49 | $0 | Not Implemented |
UD0694 # 01 Y:2004 | 01 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $318,395 | $324,700 | Not Implemented |
UD0694 # 02 Y:2004 | 02 | 2004 | AIR CONDITION ONLY SPACE NECESSARY | $295,125 | $0 | Implemented |
UD0694 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $117,513 | $80,244 | Not Implemented |
UD0694 # 04 Y:2004 | 04 | 2004 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $57,990 | $114,000 | Not Implemented |
UD0694 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,763 | $51,348 | Implemented |
UD0694 # 06 Y:2004 | 06 | 2004 | REDUCE VENTILATION AIR | $18,999 | $0 | Implemented |
UD0694 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,530 | $5,780 | Implemented |
UD0694 # 08 Y:2004 | 08 | 2004 | USE CONTINUOUS EQUIPMENT WHICH RETAINS PROCESS HEATING CONVEYORS WITHIN THE HEATED CHAMBER | $4,207 | $3,323 | Not Implemented |
UD0694 # 09 Y:2004 | 09 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $3,140 | $0 | Not Implemented |
UD0694 # 10 Y:2004 | 10 | 2004 | INSTALL OCCUPANCY SENSORS | $1,427 | $210 | Implemented |
UD0694 # 11 Y:2004 | 11 | 2004 | USE RADIANT HEATER FOR SPOT HEATING | $883 | $1,962 | Implemented |
UD0694 # 12 Y:2004 | 12 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $860 | $845 | Not Implemented |
UD0694 # 13 Y:2004 | 13 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $790 | $660 | Implemented |
UD0694 # 14 Y:2004 | 14 | 2004 | DISCONNECT BALLASTS | $393 | $13 | Implemented |
UD0694 # 15 Y:2004 | 15 | 2004 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $288 | $0 | Implemented |
MA0551 # 01 Y:2004 | 01 | 2004 | CONVERT COMBUSTION EQUIPMENT TO BURN OIL | $36,008 | $0 | Implemented |
MA0551 # 02 Y:2004 | 02 | 2004 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $13,353 | $27,860 | Implemented |
MA0551 # 03 Y:2004 | 03 | 2004 | REDUCE VENTILATION AIR | $10,267 | $4,614 | Not Implemented |
MA0551 # 04 Y:2004 | 04 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,302 | $4,680 | Implemented |
MA0551 # 05 Y:2004 | 05 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $2,941 | $138 | Implemented |
MA0551 # 06 Y:2004 | 06 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,601 | $850 | Implemented |
MA0551 # 07 Y:2004 | 07 | 2004 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,179 | $0 | Implemented |
MA0551 # 08 Y:2004 | 08 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $1,078 | $173 | Not Implemented |
MA0551 # 09 Y:2004 | 09 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $958 | $1,020 | Implemented |