IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,577

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0155 # 09 Y:1989 09 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $150 $200 Implemented
AM0060 # 01 Y:1989 01 1989 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $59,200 $0 Implemented
AM0060 # 02 Y:1989 02 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,080 $24,686 Not Implemented
AM0060 # 03 Y:1989 03 1989 COVER OPEN TANKS $9,300 $0 Implemented
AM0060 # 04 Y:1989 04 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,440 $900 Not Implemented
AM0060 # 05 Y:1989 05 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,320 $0 Not Implemented
AM0060 # 06 Y:1989 06 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,210 $940 Not Implemented
AM0060 # 07 Y:1989 07 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $540 $420 Not Implemented
AM0060 # 08 Y:1989 08 1989 INSULATE BARE EQUIPMENT $1,080 $1,080 Implemented
UD0280 # 01 Y:1989 01 1989 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $14,040 $14,400 Implemented
UD0280 # 02 Y:1989 02 1989 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,566 $7,000 Implemented
UD0280 # 03 Y:1989 03 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,696 $0 Implemented
UD0280 # 04 Y:1989 04 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,314 $0 Implemented
UD0280 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $825 $0 Implemented
UD0280 # 06 Y:1989 06 1989 INSTALL STORM WINDOWS AND DOORS $955 $1,920 Implemented
RU0046 # 01 Y:1989 01 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $422 $134 Not Implemented
RU0046 # 02 Y:1989 02 1989 INSULATE BARE EQUIPMENT $1,836 $682 Implemented
RU0046 # 03 Y:1989 03 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,698 $0 Implemented
RU0046 # 04 Y:1989 04 1989 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $4,001 $8,500 Not Implemented
RU0046 # 05 Y:1989 05 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,552 $6,800 Not Implemented
RU0046 # 06 Y:1989 06 1989 CLOSE OFF UNNEEDED STEAM LINES $1,773 $1,880 Implemented
CO0139 # 01 Y:1988 01 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $427 $150 Implemented
CO0139 # 02 Y:1988 02 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $490 $200 Implemented
CO0139 # 03 Y:1988 03 1988 REDUCE VENTILATION AIR $567 $200 Implemented
CO0139 # 04 Y:1988 04 1988 INSULATE BARE EQUIPMENT $502 $1,485 Not Implemented