Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
271
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0534 # 03 Y:2016 | 03 | 2016 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,083 | $1,000 | Implemented |
WV0534 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,026 | $4,100 | Implemented |
WV0534 # 01 Y:2016 | 01 | 2016 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $28,092 | $3,000 | Not Implemented |
WV0534 # 02 Y:2016 | 02 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,016 | $0 | Implemented |
WV0534 # 09 Y:2016 | 09 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $474 | $256 | Implemented |
WV0534 # 06 Y:2016 | 06 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,300 | $2,900 | Not Implemented |
WV0534 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,565 | $4,150 | Not Implemented |
WV0534 # 07 Y:2016 | 07 | 2016 | INSULATE BARE EQUIPMENT | $1,196 | $1,953 | Implemented |
WV0534 # 11 Y:2016 | 11 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $144 | $50 | Implemented |
WV0534 # 08 Y:2016 | 08 | 2016 | INSTALL OCCUPANCY SENSORS | $616 | $315 | Implemented |
WV0534 # 10 Y:2016 | 10 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $471 | $1,125 | Implemented |
WV0526 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,654 | $46 | Implemented |
WV0526 # 02 Y:2016 | 02 | 2016 | USE RADIANT HEATER FOR SPOT HEATING | $24,527 | $35,260 | Implemented |
WV0526 # 04 Y:2016 | 04 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $1,872 | $1,122 | Implemented |
WV0526 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,798 | $78,534 | Implemented |
WV0526 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,991 | $180 | Implemented |
WV0526 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,676 | $3,122 | Not Implemented |
UD0944 # 03 Y:2016 | 03 | 2016 | INSULATE BARE EQUIPMENT | $476 | $1,148 | Not Implemented |
UD0944 # 01 Y:2016 | 01 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,720 | $7,315 | Not Implemented |
UD0944 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $424 | $0 | Not Implemented |
UD0944 # 02 Y:2016 | 02 | 2016 | INSULATE BARE EQUIPMENT | $749 | $2,640 | Not Implemented |
WV0515 # 08 Y:2015 | 08 | 2015 | INSTALL OCCUPANCY SENSORS | $975 | $3,180 | Implemented |
WV0515 # 01 Y:2015 | 01 | 2015 | INSULATE FEEDWATER TANK | $13,405 | $6,253 | Not Implemented |
WV0515 # 06 Y:2015 | 06 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,694 | $6,400 | Not Implemented |
WV0515 # 07 Y:2015 | 07 | 2015 | INSTALL SET-BACK TIMERS | $1,310 | $1,175 | Implemented |