Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0403 # 06 Y:2022 | 06 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,656 | $480 | Not Implemented |
MI0403 # 05 Y:2022 | 05 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,149 | $40 | Implemented |
MI0403 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,275 | $5,780 | Implemented |
MI0403 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,718 | $2,020 | Implemented |
MI0403 # 02 Y:2022 | 02 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $11,648 | $5,536 | Implemented |
MI0403 # 01 Y:2022 | 01 | 2022 | OPTIMIZE PLANT POWER FACTOR | $15,827 | $43,707 | Implemented |
MI0403 # 07 Y:2022 | 07 | 2022 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,171 | $99 | Implemented |
MI0325 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,332 | $4,841 | Not Implemented |
MI0325 # 09 Y:2017 | 09 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $979 | $3,042 | Implemented |
MI0325 # 08 Y:2017 | 08 | 2017 | USE OPTIMUM THICKNESS INSULATION | $1,467 | $388 | Implemented |
MI0325 # 07 Y:2017 | 07 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,220 | $1,600 | Implemented |
MI0325 # 06 Y:2017 | 06 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,645 | $2,520 | Implemented |
MI0325 # 05 Y:2017 | 05 | 2017 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $3,801 | $160 | Implemented |
MI0325 # 04 Y:2017 | 04 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,058 | $9,700 | Not Implemented |
MI0325 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,604 | $1,660 | Implemented |
MI0325 # 01 Y:2017 | 01 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,225 | $14,854 | Not Implemented |
MI0164 # 01 Y:2008 | 01 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $114,642 | $3,960 | Implemented |
MI0164 # 10 Y:2008 | 10 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,174 | $260 | Not Implemented |
MI0164 # 09 Y:2008 | 09 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,992 | $1,032 | Implemented |
MI0164 # 08 Y:2008 | 08 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,657 | $4,400 | Not Implemented |
MI0164 # 07 Y:2008 | 07 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,297 | $40 | Implemented |
MI0164 # 06 Y:2008 | 06 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,466 | $1,032 | Implemented |
MI0164 # 05 Y:2008 | 05 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $8,597 | $4,400 | Implemented |
MI0164 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,799 | $40 | Implemented |
MI0164 # 03 Y:2008 | 03 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,553 | $22,366 | Not Implemented |