IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

179

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0908 # 07 Y:2024 07 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $40,900 $8,000 n/a
AM0908 # 01 Y:2024 01 2024 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $210,130 $2,300,000 n/a
AM0908 # 05 Y:2024 05 2024 OPTIMIZE PLANT POWER FACTOR $47,600 $59,770 n/a
AM0908 # 06 Y:2024 06 2024 REPAIR OR REPLACE STEAM TRAPS $9,410 $630 n/a
AM0908 # 04 Y:2024 04 2024 INSTALL AN UNINTERUPTABLE POWER SUPPLY $10,125 $25,600 n/a
AM0908 # 02 Y:2024 02 2024 USE OPTIMUM TEMPERATURE $182,340 $400,000 n/a
AM0908 # 10 Y:2024 10 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $530 $15 n/a
AM0908 # 09 Y:2024 09 2024 USE SYNTHETIC LUBRICANT $1,281 $0 n/a
AM0908 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $108,000 $1,583,300 n/a
AM0908 # 08 Y:2024 08 2024 PAY UTILITY BILLS ON TIME $1,283 $0 n/a
TR0050 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $8,056 $79,654 n/a
TR0050 # 05 Y:2023 05 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,139 $37,400 n/a
TR0050 # 04 Y:2023 04 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $47,772 $272,678 n/a
TR0050 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,691 $11,284 n/a
TR0050 # 03 Y:2023 03 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,636 $2,500 n/a
NT0018 # 07 Y:2023 07 2023 PURCHASE EQUIPMENT INSTEAD OF LEASING $45,600 $27,500 Not Implemented
NT0018 # 06 Y:2023 06 2023 OPTIMIZE PLANT POWER FACTOR $8,460 $6,082 Not Implemented
NT0018 # 02 Y:2023 02 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $35,653 $1,258 Not Implemented
NT0018 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,361 $4,553 Not Implemented
NT0018 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $1,450 $1,311 Not Implemented
NT0018 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,528 $0 Not Implemented
NT0018 # 08 Y:2023 08 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,056 $0 Not Implemented
NT0018 # 09 Y:2023 09 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,092 $5,443 Not Implemented
NT0018 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,420 $11,457 Implemented
NT0017 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $262 $0 Implemented