Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
44
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0010 # 02 Y:2007 | 02 | 2007 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $9,440 | $2,500 | Not Implemented |
DL0010 # 03 Y:2007 | 03 | 2007 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $4,305 | $225 | Implemented |
DL0010 # 04 Y:2007 | 04 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,529 | $450 | Implemented |
DL0010 # 05 Y:2007 | 05 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,409 | $0 | Implemented |
DL0010 # 06 Y:2007 | 06 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $622 | $622 | Not Implemented |
DL0010 # 07 Y:2007 | 07 | 2007 | INSTALL OCCUPANCY SENSORS | $454 | $524 | Not Implemented |
DL0010 # 01 Y:2007 | 01 | 2007 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $10,964 | $2,872 | Implemented |
UM0333 # 01 Y:2007 | 01 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $19,901 | $2,000 | Implemented |
UM0333 # 05 Y:2007 | 05 | 2007 | REDESIGN PROCESS | $2,329 | $3,480 | Not Implemented |
UM0333 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,589 | $3,480 | Implemented |
UM0333 # 02 Y:2007 | 02 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,803 | $50,000 | Not Implemented |
UM0333 # 03 Y:2007 | 03 | 2007 | REDUCE VENTILATION AIR | $8,623 | $100 | Implemented |
UM0333 # 07 Y:2007 | 07 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,455 | $100 | Implemented |
UM0333 # 06 Y:2007 | 06 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,506 | $1,060 | Not Implemented |
UA0009 # 08 Y:2007 | 08 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $324 | $567 | Not Implemented |
UA0009 # 05 Y:2007 | 05 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $528 | $0 | Implemented |
UA0009 # 07 Y:2007 | 07 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $150 | $73 | Not Implemented |
UA0009 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $768 | $525 | Implemented |
UA0009 # 09 Y:2007 | 09 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $59 | $45 | Not Implemented |
UA0009 # 04 Y:2007 | 04 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $600 | $236 | Implemented |
UA0009 # 03 Y:2007 | 03 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $234 | $10 | Not Implemented |
UA0009 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,681 | $16,061 | Implemented |
UA0009 # 02 Y:2007 | 02 | 2007 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $588 | $0 | Implemented |
MA0621 # 03 Y:2007 | 03 | 2007 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,253 | $10,000 | Implemented |
MA0621 # 02 Y:2007 | 02 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $32,424 | $29,000 | Not Implemented |