Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
44
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0010 # 02 Y:2007 | 02 | 2007 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $9,440 | $2,500 | Not Implemented |
DL0010 # 03 Y:2007 | 03 | 2007 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $4,305 | $225 | Implemented |
DL0010 # 04 Y:2007 | 04 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,529 | $450 | Implemented |
DL0010 # 05 Y:2007 | 05 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,409 | $0 | Implemented |
DL0010 # 06 Y:2007 | 06 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $622 | $622 | Not Implemented |
DL0010 # 07 Y:2007 | 07 | 2007 | INSTALL OCCUPANCY SENSORS | $454 | $524 | Not Implemented |
DL0010 # 01 Y:2007 | 01 | 2007 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $10,964 | $2,872 | Implemented |
UM0333 # 05 Y:2007 | 05 | 2007 | REDESIGN PROCESS | $2,329 | $3,480 | Not Implemented |
UM0333 # 06 Y:2007 | 06 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,506 | $1,060 | Not Implemented |
UM0333 # 07 Y:2007 | 07 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,455 | $100 | Implemented |
UM0333 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,589 | $3,480 | Implemented |
UM0333 # 03 Y:2007 | 03 | 2007 | REDUCE VENTILATION AIR | $8,623 | $100 | Implemented |
UM0333 # 01 Y:2007 | 01 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $19,901 | $2,000 | Implemented |
UM0333 # 02 Y:2007 | 02 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,803 | $50,000 | Not Implemented |
UA0009 # 09 Y:2007 | 09 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $59 | $45 | Not Implemented |
UA0009 # 08 Y:2007 | 08 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $324 | $567 | Not Implemented |
UA0009 # 03 Y:2007 | 03 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $234 | $10 | Not Implemented |
UA0009 # 02 Y:2007 | 02 | 2007 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $588 | $0 | Implemented |
UA0009 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,681 | $16,061 | Implemented |
UA0009 # 05 Y:2007 | 05 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $528 | $0 | Implemented |
UA0009 # 04 Y:2007 | 04 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $600 | $236 | Implemented |
UA0009 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $768 | $525 | Implemented |
UA0009 # 07 Y:2007 | 07 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $150 | $73 | Not Implemented |
MA0621 # 01 Y:2007 | 01 | 2007 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $61,876 | $354,790 | Not Implemented |
MA0621 # 02 Y:2007 | 02 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $32,424 | $29,000 | Not Implemented |