Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
65
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0227 # 05 Y:2019 | 05 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,871 | $28,000 | Not Implemented |
IC0227 # 04 Y:2019 | 04 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,978 | $9,600 | Not Implemented |
IC0227 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,117 | $7,146 | Not Implemented |
IC0227 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,441 | $1,500 | Not Implemented |
IC0227 # 01 Y:2019 | 01 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,221 | $800 | Not Implemented |
IC0226 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,094 | $167 | Not Implemented |
IC0226 # 06 Y:2019 | 06 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $650 | $60 | Not Implemented |
IC0226 # 05 Y:2019 | 05 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,367 | $0 | Not Implemented |
IC0226 # 04 Y:2019 | 04 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $343 | $1,200 | Not Implemented |
IC0226 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,608 | $4,300 | Not Implemented |
IC0226 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $919 | $689 | Not Implemented |
UA0217 # 07 Y:2019 | 07 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,995 | $3,320 | Not Implemented |
UA0217 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,933 | $50 | Not Implemented |
UA0217 # 01 Y:2019 | 01 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,041 | $3,585 | Not Implemented |
UA0217 # 04 Y:2019 | 04 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $36,500 | $104,362 | Not Implemented |
UA0217 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,910 | $1,395 | Implemented |
UA0217 # 06 Y:2019 | 06 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,941 | $50 | Implemented |
UA0217 # 05 Y:2019 | 05 | 2019 | INSTALL OCCUPANCY SENSORS | $856 | $922 | Not Implemented |
SU0484 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,516 | $4,046 | Implemented |
SU0484 # 06 Y:2019 | 06 | 2019 | REDUCE VENTILATION AIR | $514 | $929 | Implemented |
SU0484 # 05 Y:2019 | 05 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $236 | $318 | Implemented |
SU0484 # 01 Y:2019 | 01 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $150 | $14 | Not Implemented |
SU0484 # 08 Y:2019 | 08 | 2019 | INSTALL OCCUPANCY SENSORS | $69 | $30 | Implemented |
SU0484 # 04 Y:2019 | 04 | 2019 | REPLACE BOILER | $168,017 | $185,420 | Not Implemented |
SU0484 # 03 Y:2019 | 03 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $22,670 | $15,784 | Not Implemented |