IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0954 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,577 $1,850 Implemented
GT0954 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,031 $400 Implemented
GT0954 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,911 $2,747 Implemented
GT0954 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $326 $225 Implemented
GT0954 # 05 Y:2020 05 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,985 $8,432 Not Implemented
GT0954 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $472 $1,123 Implemented
GT0954 # 07 Y:2020 07 2020 INSTALL OCCUPANCY SENSORS $1,866 $5,680 Not Implemented
GT0954 # 08 Y:2020 08 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $19,391 $226,091 Not Implemented
SF0561 # 07 Y:2020 07 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $35,550 $236,909 Implemented
SF0561 # 06 Y:2020 06 2020 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,263 $18,437 Not Implemented
SF0561 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,548 $4,226 Implemented
SF0561 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,435 $3,959 Not Implemented
SF0561 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $3,116 $1,412 Implemented
SF0561 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,203 $110 Not Implemented
SF0561 # 01 Y:2020 01 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,397 $525 Not Implemented
WV0597 # 05 Y:2020 05 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,072 $1,700 Implemented
WV0597 # 08 Y:2020 08 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,418 $7,061 Not Implemented
WV0597 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,394 $2,625 Implemented
WV0597 # 06 Y:2020 06 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,029 $1,650 Not Implemented
WV0597 # 07 Y:2020 07 2020 DEVELOP A REPAIR/REPLACE POLICY $1,940 $444 Implemented
WV0597 # 10 Y:2020 10 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $254 $191 Implemented
WV0597 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,457 $2,750 Implemented
WV0597 # 02 Y:2020 02 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,906 $0 Implemented
WV0597 # 01 Y:2020 01 2020 UPGRADE CONTROLS ON COMPRESSORS $14,898 $7,950 Not Implemented
WV0597 # 09 Y:2020 09 2020 INSTALL OCCUPANCY SENSORS $446 $1,536 Implemented