IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
SIC 3471 Plating And Polishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0334 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $18,200 $22,300 Implemented
AM0334 # 07 Y:1998 07 1998 CONVERT TO AQUEOUS CLEANING SYSTEM $1,260 $1,030 Implemented
AM0334 # 06 Y:1998 06 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,070 $35 Implemented
AM0334 # 03 Y:1998 03 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $4,900 $0 Implemented
AM0334 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,300 $1,000 Implemented
AM0259 # 09 Y:1996 09 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90 $180 Implemented
AM0259 # 08 Y:1996 08 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $260 $110 Implemented
AM0259 # 07 Y:1996 07 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $510 $175 Implemented
AM0259 # 06 Y:1996 06 1996 INSULATE BARE EQUIPMENT $1,030 $850 Implemented
AM0259 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,150 $200 Implemented
AM0259 # 04 Y:1996 04 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,350 $500 Implemented
AM0259 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,920 $9,040 Implemented
AM0248 # 08 Y:1995 08 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $38,980 $40,000 Implemented
AM0248 # 01 Y:1995 01 1995 INSULATE BARE EQUIPMENT $9,500 $2,930 Implemented
AM0248 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $1,020 $290 Implemented
AM0248 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $750 $200 Implemented
AM0248 # 05 Y:1995 05 1995 UPGRADE OBSOLETE EQUIPMENT $790 $655 Implemented
AM0248 # 06 Y:1995 06 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $350 $0 Implemented
AM0248 # 07 Y:1995 07 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $310 $500 Implemented
AM0248 # 09 Y:1995 09 1995 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $8,550 $19,700 Implemented
AM0248 # 10 Y:1995 10 1995 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $340 $0 Implemented
AM0135 # 06 Y:1991 06 1991 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $440 $315 Implemented
AM0135 # 05 Y:1991 05 1991 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $630 $340 Implemented
AM0135 # 04 Y:1991 04 1991 RECOVER WASTE HEAT FROM EQUIPMENT $840 $1,009 Implemented
AM0135 # 03 Y:1991 03 1991 INCREASE AMOUNT OF CONDENSATE RETURNED $870 $715 Implemented