IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

79

matching recommendations
Reset
SIC 3471 Plating And Polishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0248 # 02 Y:1995 02 1995 OPTIMIZE PLANT POWER FACTOR $8,584 $8,750 Not Implemented
AM0248 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $1,020 $290 Implemented
AM0248 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $750 $200 Implemented
AM0248 # 05 Y:1995 05 1995 UPGRADE OBSOLETE EQUIPMENT $790 $655 Implemented
AM0248 # 07 Y:1995 07 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $310 $500 Implemented
AM0248 # 08 Y:1995 08 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $38,980 $40,000 Implemented
AM0248 # 09 Y:1995 09 1995 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $8,550 $19,700 Implemented
AM0248 # 10 Y:1995 10 1995 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $340 $0 Implemented
AM0248 # 06 Y:1995 06 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $350 $0 Implemented
AM0135 # 03 Y:1991 03 1991 INCREASE AMOUNT OF CONDENSATE RETURNED $870 $715 Implemented
AM0135 # 01 Y:1991 01 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,330 $6,532 Implemented
AM0135 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $2,190 $100 Implemented
AM0135 # 04 Y:1991 04 1991 RECOVER WASTE HEAT FROM EQUIPMENT $840 $1,009 Implemented
AM0135 # 05 Y:1991 05 1991 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $630 $340 Implemented
AM0135 # 06 Y:1991 06 1991 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $440 $315 Implemented
AM0135 # 07 Y:1991 07 1991 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $320 $0 Implemented
AM0135 # 08 Y:1991 08 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $165 $0 Implemented
AM0135 # 09 Y:1991 09 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $120 $75 Implemented
AM0128 # 01 Y:1991 01 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,350 $7,500 Not Implemented
AM0128 # 11 Y:1991 11 1991 TURN OFF EQUIPMENT WHEN NOT IN USE $130 $90 Not Implemented
AM0128 # 10 Y:1991 10 1991 INSTALL SET-BACK TIMERS $160 $135 Not Implemented
AM0128 # 09 Y:1991 09 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $200 $0 Not Implemented
AM0128 # 08 Y:1991 08 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $215 $130 Not Implemented
AM0128 # 07 Y:1991 07 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $530 $285 Not Implemented
AM0128 # 06 Y:1991 06 1991 IMPROVE LUBRICATION PRACTICES $410 $0 Not Implemented