IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

145

matching recommendations
Reset
SIC 3471 Plating And Polishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0227 # 01 Y:2019 01 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,221 $800 Not Implemented
IC0227 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,441 $1,500 Not Implemented
IC0227 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,117 $7,146 Not Implemented
IC0227 # 04 Y:2019 04 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,978 $9,600 Not Implemented
IC0227 # 05 Y:2019 05 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,871 $28,000 Not Implemented
UM0473 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $2,449 $630 n/a
UM0473 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,291 $23,462 n/a
UM0473 # 04 Y:2016 04 2016 COVER OPEN TANKS $52,272 $2,335 n/a
UM0473 # 08 Y:2016 08 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,901 $10,265 n/a
UM0473 # 02 Y:2016 02 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,050 $1,000 n/a
UM0473 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,566 $1,000 n/a
UM0473 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $6,129 $15,000 n/a
UM0473 # 05 Y:2016 05 2016 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,899 $2,835 n/a
UM0468 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,125 $43,167 Implemented
UM0468 # 04 Y:2016 04 2016 INSULATE BARE EQUIPMENT $3,084 $2,000 Implemented
UM0468 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,680 $2,150 Not Implemented
UM0468 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $1,588 $1,500 Implemented
UM0468 # 01 Y:2016 01 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $695 $1,500 Not Implemented
UM0468 # 06 Y:2016 06 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,119 $10,000 Not Implemented
UM0428 # 01 Y:2013 01 2013 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $74,405 $210,000 Not Implemented
UM0428 # 04 Y:2013 04 2013 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $636 $1,200 Implemented
UM0428 # 06 Y:2013 06 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,332 $500 Not Implemented
UM0428 # 02 Y:2013 02 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,106 $1,500 Implemented
UM0428 # 05 Y:2013 05 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,177 $9,000 Implemented
UM0428 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $990 $100 Implemented