IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,031

matching recommendations
Reset
SIC 3479 Metal Coating And Allied Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0186 # 01 Y:1990 01 1990 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,664 $5,000 Implemented
MA0186 # 02 Y:1990 02 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,372 $5,957 Not Implemented
MA0186 # 03 Y:1990 03 1990 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,848 $500 Implemented
MA0186 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,333 $9,634 Implemented
MA0186 # 05 Y:1990 05 1990 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,130 $1,195 Implemented
MA0186 # 06 Y:1990 06 1990 COVER OPEN TANKS $1,262 $229 Implemented
AM0076 # 01 Y:1990 01 1990 OPTIMIZE PLANT POWER FACTOR $23,000 $64,000 Implemented
AM0076 # 02 Y:1990 02 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,100 $2,000 Implemented
AM0076 # 03 Y:1990 03 1990 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,940 $3,614 Implemented
AM0076 # 04 Y:1990 04 1990 INSULATE BARE EQUIPMENT $240 $180 Not Implemented
AM0076 # 05 Y:1990 05 1990 INSULATE BARE EQUIPMENT $127 $199 Implemented
AM0060 # 01 Y:1989 01 1989 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $59,200 $0 Implemented
AM0060 # 02 Y:1989 02 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,080 $24,686 Not Implemented
AM0060 # 03 Y:1989 03 1989 COVER OPEN TANKS $9,300 $0 Implemented
AM0060 # 04 Y:1989 04 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,440 $900 Not Implemented
AM0060 # 05 Y:1989 05 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,320 $0 Not Implemented
AM0060 # 06 Y:1989 06 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,210 $940 Not Implemented
AM0060 # 07 Y:1989 07 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $540 $420 Not Implemented
AM0060 # 08 Y:1989 08 1989 INSULATE BARE EQUIPMENT $1,080 $1,080 Implemented
RU0046 # 01 Y:1989 01 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $422 $134 Not Implemented
RU0046 # 02 Y:1989 02 1989 INSULATE BARE EQUIPMENT $1,836 $682 Implemented
RU0046 # 03 Y:1989 03 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,698 $0 Implemented
RU0046 # 04 Y:1989 04 1989 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $4,001 $8,500 Not Implemented
RU0046 # 05 Y:1989 05 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,552 $6,800 Not Implemented
RU0046 # 06 Y:1989 06 1989 CLOSE OFF UNNEEDED STEAM LINES $1,773 $1,880 Implemented