IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,045

matching recommendations
Reset
SIC 3479 Metal Coating And Allied Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0060 # 01 Y:1989 01 1989 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $59,200 $0 Implemented
AM0060 # 02 Y:1989 02 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,080 $24,686 Not Implemented
AM0060 # 03 Y:1989 03 1989 COVER OPEN TANKS $9,300 $0 Implemented
AM0060 # 04 Y:1989 04 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,440 $900 Not Implemented
AM0060 # 05 Y:1989 05 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,320 $0 Not Implemented
AM0060 # 06 Y:1989 06 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,210 $940 Not Implemented
AM0060 # 07 Y:1989 07 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $540 $420 Not Implemented
AM0060 # 08 Y:1989 08 1989 INSULATE BARE EQUIPMENT $1,080 $1,080 Implemented
RU0046 # 01 Y:1989 01 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $422 $134 Not Implemented
RU0046 # 02 Y:1989 02 1989 INSULATE BARE EQUIPMENT $1,836 $682 Implemented
RU0046 # 03 Y:1989 03 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,698 $0 Implemented
RU0046 # 04 Y:1989 04 1989 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $4,001 $8,500 Not Implemented
RU0046 # 05 Y:1989 05 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,552 $6,800 Not Implemented
RU0046 # 06 Y:1989 06 1989 CLOSE OFF UNNEEDED STEAM LINES $1,773 $1,880 Implemented
CO0114 # 01 Y:1988 01 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $216 $100 Implemented
CO0114 # 02 Y:1988 02 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $1,655 $1,545 Implemented
CO0114 # 03 Y:1988 03 1988 COVER OPEN TANKS $7,093 $1,400 Not Implemented
CO0114 # 04 Y:1988 04 1988 INSULATE BARE EQUIPMENT $2,783 $2,400 Implemented
CO0114 # 05 Y:1988 05 1988 TURN OFF EQUIPMENT WHEN NOT IN USE $1,713 $1,700 Implemented
CO0114 # 06 Y:1988 06 1988 COVER OPEN TANKS $29,547 $4,600 Implemented
CO0114 # 07 Y:1988 07 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,311 $12,500 Not Implemented
CO0114 # 08 Y:1988 08 1988 AIR CONDITION ONLY SPACE NECESSARY $903 $100 Not Implemented
CO0114 # 09 Y:1988 09 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $182 $150 Implemented
CO0114 # 10 Y:1988 10 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40 $97 Not Implemented
AM0020 # 01 Y:1988 01 1988 INSULATE BARE EQUIPMENT $2,009 $3,919 Not Implemented