IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
SIC 3479 Metal Coating And Allied Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0382 # 02 Y:2025 02 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,303 $4,500 n/a
MZ0382 # 01 Y:2025 01 2025 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $595 $100 n/a
MZ0382 # 04 Y:2025 04 2025 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $149,231 $825,000 n/a
MZ0382 # 03 Y:2025 03 2025 INSTALL OCCUPANCY SENSORS $179 $1,000 n/a
IC0317 # 01 Y:2025 01 2025 INSTALL EFFICIENT RECTIFIERS $6,191 $19,124 Not Implemented
IC0317 # 11 Y:2025 11 2025 INSTALL OCCUPANCY SENSORS $151 $425 Implemented
IC0317 # 12 Y:2025 12 2025 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $11,344 $21,200 Implemented
IC0317 # 13 Y:2025 13 2025 INSULATE BARE EQUIPMENT $2,154 $4,516 Implemented
IC0317 # 04 Y:2025 04 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $431 $1,113 Not Implemented
IC0317 # 02 Y:2025 02 2025 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $10,127 $7,240 Implemented
IC0317 # 06 Y:2025 06 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $704 $0 Implemented
IC0317 # 03 Y:2025 03 2025 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $930 $0 Implemented
IC0317 # 08 Y:2025 08 2025 USE RADIANT HEATER FOR SPOT HEATING $15,053 $20,087 Not Implemented
IC0317 # 10 Y:2025 10 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $397 $597 Not Implemented
IC0317 # 05 Y:2025 05 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,337 $108 Implemented
IC0317 # 07 Y:2025 07 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $32,668 $258,530 Not Implemented
IC0317 # 09 Y:2025 09 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $972 $2,234 Implemented
BD0489 # 04 Y:2016 04 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,075 $1,320 n/a
BD0489 # 08 Y:2016 08 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $196 $400 n/a
BD0489 # 07 Y:2016 07 2016 RECOVER WASTE HEAT FROM EQUIPMENT $270 $800 n/a
BD0489 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $578 $400 n/a
BD0489 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $744 $411 n/a
BD0489 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $1,418 $825 n/a
BD0489 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,863 $7,497 n/a
BD0489 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,215 $16,983 n/a