IAC logo
IAC Assessment: BD0489
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0489
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2016
Principal Product Recognition Signage, Donor Walls, Metal Etching
NAICS 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479 - Metal Coating And Allied Services
Sales $10,000,000-$50,000,000
# of Employees 35
Plant Area (Sq.Ft.) 50,000
Annual Production 1 Units
Production Hrs. Annual 2,080
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $52,685 519,840 kWh $0.10
Electricity Demand $33,319 2,758 kW-months/year $12.08
Electricity Fees $2,096 - $ -
Natural Gas $9,088 1,461 MMBtu $6.22
LPG $1,101 17 MMBtu $63.28
TOTAL ENERGY COSTS $98,939
RECOMMENDED SAVINGS* $24,359 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,215
Cost:
$16,983
$8,422 83,117 $5,793 480 - - - - - - $8,422
83,117
kWh
$5,793
480
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,863
Cost:
$7,497
$3,471 34,257 $2,392 198 - - - - - - $3,471
34,257
kWh
$2,392
198
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,418
Cost:
$825
$698 6,889 $720 60 - - - - - - $698
6,889
kWh
$720
60
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,075
Cost:
$1,320
$637 6,285 $438 36 - - - - - - $637
6,285
kWh
$438
36
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$744
Cost:
$411
$455 4,493 $83 7 - - $86 - $120 - $455
4,493
kWh
$83
7
kW-months/year
-
-
MMBtu
$86
-
$
$120
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$578
Cost:
$400
$343 3,382 $235 20 - - - - - - $343
3,382
kWh
$235
20
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$270
Cost:
$800
- - - - $270 48 - - - - -
-
kWh
-
-
kW-months/year
$270
48
MMBtu
-
-
$
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$196
Cost:
$400
$116 1,143 $80 7 - - - - - - $116
1,143
kWh
$80
7
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$24,359
Cost:
$28,636
$14,142 139,566 $9,741 806 $270 48 $86 - $120 - $14,142
139,566
kWh
$9,741
806
kW-months/year
$270
48
MMBtu
$86
-
$
$120
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost