IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 348 Ordnance And Accessories, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0689 # 01 Y:2012 01 2012 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $85,000 $250,000 Implemented
MA0689 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,784 $5,000 Implemented
MA0689 # 04 Y:2012 04 2012 USE OPTIMUM TEMPERATURE $13,757 $8,000 Implemented
MA0689 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,785 $3,000 Implemented
MA0689 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,677 $9,750 Implemented
MA0689 # 09 Y:2012 09 2012 USE OPTIMUM TEMPERATURE $5,818 $900 Implemented
MA0689 # 10 Y:2012 10 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,139 $5,200 Implemented
MA0689 # 11 Y:2012 11 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,144 $1,000 Implemented
MA0689 # 12 Y:2012 12 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,245 $1,500 Implemented
MA0689 # 13 Y:2012 13 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,032 $700 Implemented
MA0689 # 15 Y:2012 15 2012 INSULATE BARE EQUIPMENT $1,579 $2,300 Implemented
MA0689 # 16 Y:2012 16 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,244 $1,000 Implemented
MA0689 # 17 Y:2012 17 2012 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,042 $500 Implemented
MA0689 # 18 Y:2012 18 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $717 $200 Implemented
MA0634 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,014 $119,495 Implemented
MA0634 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $498 $500 Implemented
MA0634 # 04 Y:2008 04 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,932 $2,500 Implemented
MA0376 # 03 Y:1996 03 1996 REDUCE VENTILATION AIR $1,830 $1,150 Implemented
MA0376 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,918 $13,680 Implemented
MA0376 # 05 Y:1996 05 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $450 $516 Implemented
MA0376 # 01 Y:1996 01 1996 USE EVAPORATION TO CONCENTRATE MATERIAL $24,817 $16,000 Implemented
MA0160 # 04 Y:1989 04 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,708 $1,000 Implemented
MA0160 # 02 Y:1989 02 1989 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $434 $0 Implemented