IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 3482 Small Arms Ammunition
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0394 # 02 Y:2006 02 2006 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $24,709 $6,500 Implemented
IA0394 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,998 $25 Implemented
IA0394 # 04 Y:2006 04 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,184 $74 Not Implemented
IA0394 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $17,292 $44,400 Not Implemented
IA0394 # 06 Y:2006 06 2006 RECOVER WASTE HEAT FROM EQUIPMENT $16,584 $15,900 Not Implemented
IA0394 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $25,628 $15,200 Not Implemented
IA0394 # 08 Y:2006 08 2006 INSULATE BARE EQUIPMENT $2,083 $1,969 Not Implemented
IA0394 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $41,729 $4,200 Implemented
MO0258 # 05 Y:1999 05 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,750 $450 Implemented
MO0258 # 08 Y:1999 08 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $460 $345 Not Implemented
MO0258 # 07 Y:1999 07 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $60,000 $27,500 Implemented
MO0258 # 06 Y:1999 06 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,460 $0 Not Implemented
MO0258 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,256 $40 Not Implemented
MO0258 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,116 $49 Not Implemented
MO0258 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,257 $3,392 Implemented
MO0258 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,911 $4,897 Implemented
SD0054 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,157 $3,130 Implemented
SD0054 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,190 $440 Implemented
SD0054 # 03 Y:1993 03 1993 INSULATE BARE EQUIPMENT $4,096 $7,642 Not Implemented
SD0054 # 04 Y:1993 04 1993 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $6,910 $12,725 Not Implemented
SD0054 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,930 $0 Implemented
SD0054 # 06 Y:1993 06 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $7,440 $9,720 Implemented
SD0054 # 07 Y:1993 07 1993 INSTALL SET-BACK TIMERS $4,573 $4,480 Implemented
SD0054 # 08 Y:1993 08 1993 INSTALL SET-BACK TIMERS $826 $230 Not Implemented
SD0054 # 09 Y:1993 09 1993 INSTALL SET-BACK TIMERS $1,033 $0 Implemented