Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsSIC | 3483 | Ammunition, Exc. For Small Arms, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0505 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,022 | $2,400 | Implemented |
SD0505 # 03 Y:2011 | 03 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,899 | $10,561 | Not Implemented |
SD0505 # 04 Y:2011 | 04 | 2011 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $17,230 | $18,098 | Not Implemented |
SD0505 # 05 Y:2011 | 05 | 2011 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $7,773 | $17,794 | Not Implemented |
SD0505 # 01 Y:2011 | 01 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,430 | $0 | Not Implemented |
WV0421 # 16 Y:2011 | 16 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $266 | $191 | Implemented |
WV0421 # 15 Y:2011 | 15 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $294 | $241 | Implemented |
WV0421 # 14 Y:2011 | 14 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,352 | $1,551 | Not Implemented |
WV0421 # 13 Y:2011 | 13 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,849 | $386 | Implemented |
WV0421 # 12 Y:2011 | 12 | 2011 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,007 | $3,000 | Implemented |
WV0421 # 11 Y:2011 | 11 | 2011 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $2,484 | $8,964 | Not Implemented |
WV0421 # 10 Y:2011 | 10 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,731 | $21 | Implemented |
WV0421 # 09 Y:2011 | 09 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,091 | $1,163 | Not Implemented |
WV0421 # 08 Y:2011 | 08 | 2011 | INSULATE BARE EQUIPMENT | $4,166 | $1,910 | Implemented |
WV0421 # 07 Y:2011 | 07 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $4,203 | $841 | Implemented |
WV0421 # 06 Y:2011 | 06 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,339 | $3,000 | Not Implemented |
WV0421 # 05 Y:2011 | 05 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,567 | $10,314 | Not Implemented |
WV0421 # 04 Y:2011 | 04 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,529 | $2,469 | Implemented |
WV0421 # 03 Y:2011 | 03 | 2011 | COVER OPEN TANKS | $15,551 | $3,659 | Not Implemented |
WV0421 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,118 | $28,554 | Implemented |
WV0421 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,602 | $33,993 | Not Implemented |