Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,209
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0294 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $46,922 | $377,678 | n/a |
UA0294 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $813 | $1,572 | n/a |
UA0294 # 07 Y:2025 | 07 | 2025 | OPTIMIZE PLANT POWER FACTOR | $14,895 | $2,777 | n/a |
UA0294 # 03 Y:2025 | 03 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $916 | $1,133 | n/a |
UA0294 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $232 | $250 | n/a |
UA0294 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $2,012 | $2,261 | n/a |
UA0294 # 04 Y:2025 | 04 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $5,323 | $29 | n/a |
UU0267 # 07 Y:2025 | 07 | 2025 | USE AUTOMATIC FLOW CONTROL | $2,903 | $6,218 | n/a |
UU0267 # 03 Y:2025 | 03 | 2025 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $6,322 | $119,100 | n/a |
UU0267 # 02 Y:2025 | 02 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,200 | $6,000 | n/a |
UU0267 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,113 | $29,674 | n/a |
UU0267 # 04 Y:2025 | 04 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,650 | $9,727 | n/a |
UU0267 # 08 Y:2025 | 08 | 2025 | USE MAGNETIC TECHNOLOGY TO TREAT WATER | $12,294 | $19,900 | n/a |
UU0267 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,456 | $3,600 | n/a |
UU0267 # 01 Y:2025 | 01 | 2025 | OPTIMIZE PLANT POWER FACTOR | $3,730 | $6,750 | n/a |
TT0324 # 09 Y:2025 | 09 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,799 | $60 | n/a |
TT0324 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,732 | $35,000 | n/a |
TT0324 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $29,835 | $24,750 | n/a |
TT0324 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,944 | $82,992 | n/a |
TT0324 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,316 | $1,305 | n/a |
TT0324 # 07 Y:2025 | 07 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $3,929 | $13,000 | n/a |
TT0324 # 02 Y:2025 | 02 | 2025 | APPLY FOR INVESTMENT INCENTIVES | $83,556 | $0 | n/a |
TT0324 # 08 Y:2025 | 08 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,846 | $500 | n/a |
TT0324 # 01 Y:2025 | 01 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $160,334 | $75,000 | n/a |
LS2507 # 04 Y:2025 | 04 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,714 | $65,000 | n/a |