Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,274
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0575 # 06 Y:2025 | 06 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $769 | $393 | n/a |
SU0575 # 08 Y:2025 | 08 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $98 | $186 | n/a |
SU0575 # 01 Y:2025 | 01 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,632 | $0 | n/a |
SU0575 # 07 Y:2025 | 07 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,242 | $4,739 | n/a |
SU0575 # 04 Y:2025 | 04 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,093 | $37 | n/a |
SU0575 # 10 Y:2025 | 10 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $13,875 | $178,227 | n/a |
SU0575 # 02 Y:2025 | 02 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,156 | $0 | n/a |
SU0575 # 09 Y:2025 | 09 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $144 | $621 | n/a |
SU0575 # 03 Y:2025 | 03 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,602 | $49 | n/a |
SU0575 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,017 | $90 | n/a |
UC2511 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $6,520 | $10,625 | n/a |
UC2511 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $225,469 | $2,423,010 | n/a |
UC2511 # 09 Y:2025 | 09 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $116,730 | $360,000 | n/a |
UC2511 # 08 Y:2025 | 08 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,726 | $75 | n/a |
UC2511 # 06 Y:2025 | 06 | 2025 | INSULATE BARE EQUIPMENT | $3,267 | $2,180 | n/a |
UC2511 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,109 | $1,474 | n/a |
UC2511 # 04 Y:2025 | 04 | 2025 | USE PHOTOCELL CONTROLS | $6,789 | $14,000 | n/a |
UC2511 # 02 Y:2025 | 02 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,290 | $2,200 | n/a |
UC2511 # 05 Y:2025 | 05 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,999 | $8,485 | n/a |
MU0070 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $173 | $1,250 | n/a |
MU0070 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $330 | $75 | n/a |
MU0070 # 02 Y:2025 | 02 | 2025 | OPTIMIZE PLANT POWER FACTOR | $1,332 | $6,432 | n/a |
MU0070 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $121 | $177 | n/a |
MU0070 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $881 | $0 | n/a |
MU0070 # 01 Y:2025 | 01 | 2025 | USE UTILITY CONTROLLED POWER MANAGEMENT | $5,350 | $0 | n/a |