IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0263 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,113 $11,950 Implemented
ST0047 # 05 Y:1985 05 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $382 $1,100 Implemented
ST0047 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,188 $120 Implemented
ST0047 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,895 $16,240 Implemented
LT0050 # 03 Y:1985 03 1985 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $929 $2,700 Implemented
LT0050 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,567 $900 Implemented
ST0047 # 07 Y:1985 07 1985 INSTALL STORM WINDOWS AND DOORS $1,148 $2,025 Implemented
ST0047 # 08 Y:1985 08 1985 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,210 $0 Implemented
ST0047 # 09 Y:1985 09 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $617 $200 Implemented
ST0047 # 13 Y:1985 13 1985 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $3,050 $6,397 Implemented
TN0263 # 03 Y:1985 03 1985 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,318 $0 Implemented
ST0047 # 11 Y:1985 11 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $119 $0 Implemented
ST0042 # 07 Y:1985 07 1985 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $599 $70 Implemented
ST0042 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,086 $200 Implemented
GT0267 # 06 Y:1985 06 1985 AIR CONDITION ONLY SPACE NECESSARY $1,860 $1,000 Implemented
ST0042 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $799 $537 Implemented
ST0042 # 04 Y:1985 04 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,863 $2,700 Implemented
GT0267 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,640 $450 Implemented
GT0267 # 03 Y:1985 03 1985 COVER OPEN TANKS $3,200 $600 Implemented
TN0257 # 05 Y:1985 05 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,048 $450 Implemented
GT0263 # 06 Y:1985 06 1985 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $21,300 $400 Implemented
GT0263 # 05 Y:1985 05 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $787 $3,679 Implemented
GT0263 # 01 Y:1985 01 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $58,700 $82,000 Implemented
OK0160 # 02 Y:1985 02 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,464 $300 Implemented
OK0160 # 01 Y:1985 01 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $622 $100 Implemented