IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

356

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1081 # 01 Y:2024 01 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $792 $0 n/a
UD1081 # 03 Y:2024 03 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $55,362 $6,264 n/a
UD1081 # 10 Y:2024 10 2024 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $621 $249 n/a
UD1081 # 07 Y:2024 07 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,626 $7,875 n/a
UD1081 # 02 Y:2024 02 2024 REDUCE FLUID FLOW RATES $29,869 $3,076 n/a
UD1081 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,187 $1,235 n/a
UD1081 # 06 Y:2024 06 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,481 $730 n/a
UD1081 # 08 Y:2024 08 2024 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $3,404 $0 n/a
UD1081 # 04 Y:2024 04 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,442 $0 n/a
UD1081 # 09 Y:2024 09 2024 OPTIMIZE PLANT POWER FACTOR $6,380 $17,600 n/a
UD1080 # 03 Y:2024 03 2024 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $1,555 $405 Not Implemented
UD1080 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,018 $924 Implemented
UD1080 # 02 Y:2024 02 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $165 $0 Not Implemented
UD1080 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $31 $142 Not Implemented
UD1080 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $808 $941 Implemented
UD1080 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,541 $11,151 Implemented
IP0169 # 14 Y:2023 14 2023 DISCONNECT BALLASTS $7 $20 Implemented
IP0169 # 13 Y:2023 13 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,020 $7,379 Implemented
IP0169 # 12 Y:2023 12 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,942 $9,196 Not Implemented
IP0169 # 11 Y:2023 11 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,267 $5,079 Implemented
IP0169 # 09 Y:2023 09 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $786 $679 Implemented
IP0169 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,155 $837 Implemented
IP0169 # 06 Y:2023 06 2023 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $5,069 $1,503 Implemented
IP0169 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,451 $478 Implemented
IP0169 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,007 $0 Implemented