IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,115

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0599 # 07 Y:2000 07 2000 PURCHASE APPROPRIATELY SIZED MATERIAL $224,052 $150 Not Implemented
WI0379 # 01 Y:2000 01 2000 INSTALL SENSORS TO DETECT DEFECTS $36,000 $35,000 Not Implemented
WI0379 # 02 Y:2000 02 2000 DISTILL CONTAMINATED SOLVENTS FOR REUSE $20,843 $14,000 Not Implemented
WI0379 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,891 $11,765 Not Implemented
WI0379 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,151 $740 Not Implemented
WI0379 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $473 $90 Implemented
WI0379 # 06 Y:2000 06 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,945 $8,000 Implemented
WI0379 # 07 Y:2000 07 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,040 $0 Not Implemented
WI0379 # 08 Y:2000 08 2000 INSTALL TIMERS AND/OR THERMOSTATS $573 $200 Not Implemented
WI0379 # 09 Y:2000 09 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $527 $100 Not Implemented
WI0379 # 10 Y:2000 10 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $429 $0 Not Implemented
WI0379 # 11 Y:2000 11 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $296 $285 Not Implemented
WI0379 # 12 Y:2000 12 2000 INSULATE BARE EQUIPMENT $348 $238 Not Implemented
OK0597 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,212 $19,769 Implemented
OK0597 # 02 Y:2000 02 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $794 $176 Not Implemented
OK0597 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $2,790 $1,500 Not Implemented
OK0597 # 04 Y:2000 04 2000 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,995 $4,000 Not Implemented
OK0597 # 05 Y:2000 05 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $19,012 $2,700 Not Implemented
AS0278 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,451 $5,643 Not Implemented
AS0278 # 02 Y:2000 02 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $260 $120 Not Implemented
AS0278 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,407 $120 Implemented
AS0278 # 04 Y:2000 04 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $666 $60 Implemented
AS0278 # 05 Y:2000 05 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $970 $60 Implemented
UD0596 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $33,230 $60,000 Not Implemented
UD0596 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,200 $27,423 Implemented