Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,115
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0599 # 07 Y:2000 | 07 | 2000 | PURCHASE APPROPRIATELY SIZED MATERIAL | $224,052 | $150 | Not Implemented |
WI0379 # 01 Y:2000 | 01 | 2000 | INSTALL SENSORS TO DETECT DEFECTS | $36,000 | $35,000 | Not Implemented |
WI0379 # 02 Y:2000 | 02 | 2000 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $20,843 | $14,000 | Not Implemented |
WI0379 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,891 | $11,765 | Not Implemented |
WI0379 # 04 Y:2000 | 04 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,151 | $740 | Not Implemented |
WI0379 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $473 | $90 | Implemented |
WI0379 # 06 Y:2000 | 06 | 2000 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $2,945 | $8,000 | Implemented |
WI0379 # 07 Y:2000 | 07 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,040 | $0 | Not Implemented |
WI0379 # 08 Y:2000 | 08 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $573 | $200 | Not Implemented |
WI0379 # 09 Y:2000 | 09 | 2000 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $527 | $100 | Not Implemented |
WI0379 # 10 Y:2000 | 10 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $429 | $0 | Not Implemented |
WI0379 # 11 Y:2000 | 11 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $296 | $285 | Not Implemented |
WI0379 # 12 Y:2000 | 12 | 2000 | INSULATE BARE EQUIPMENT | $348 | $238 | Not Implemented |
OK0597 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,212 | $19,769 | Implemented |
OK0597 # 02 Y:2000 | 02 | 2000 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $794 | $176 | Not Implemented |
OK0597 # 03 Y:2000 | 03 | 2000 | OPTIMIZE PLANT POWER FACTOR | $2,790 | $1,500 | Not Implemented |
OK0597 # 04 Y:2000 | 04 | 2000 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,995 | $4,000 | Not Implemented |
OK0597 # 05 Y:2000 | 05 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $19,012 | $2,700 | Not Implemented |
AS0278 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,451 | $5,643 | Not Implemented |
AS0278 # 02 Y:2000 | 02 | 2000 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $260 | $120 | Not Implemented |
AS0278 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,407 | $120 | Implemented |
AS0278 # 04 Y:2000 | 04 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $666 | $60 | Implemented |
AS0278 # 05 Y:2000 | 05 | 2000 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $970 | $60 | Implemented |
UD0596 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $33,230 | $60,000 | Not Implemented |
UD0596 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,200 | $27,423 | Implemented |