Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,115
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL0222 # 06 Y:1999 | 06 | 1999 | CONVERT TO ELECTROSTATIC POWDER COATING | $32,230 | $13,000 | Not Implemented |
UL0222 # 07 Y:1999 | 07 | 1999 | REDUCE OR ELIMINATE WASTE | $55,904 | $285,000 | Not Implemented |
UL0222 # 08 Y:1999 | 08 | 1999 | INSTALL EQUIPMENT TO MOVE PRODUCT | $53,880 | $0 | Implemented |
MA0440 # 01 Y:1999 | 01 | 1999 | CHANGE OPERATING CONDITIONS | $29,415 | $130,900 | Not Implemented |
MA0440 # 02 Y:1999 | 02 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,896 | $15,790 | Implemented |
MA0440 # 03 Y:1999 | 03 | 1999 | CHANGE OPERATING CONDITIONS | $2,562 | $27,140 | Not Implemented |
MA0440 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,444 | $3,400 | Implemented |
MA0440 # 05 Y:1999 | 05 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,278 | $5,204 | Implemented |
MA0440 # 06 Y:1999 | 06 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,349 | $70,000 | Not Implemented |
MA0440 # 07 Y:1999 | 07 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $709 | $1,245 | Implemented |
MA0440 # 08 Y:1999 | 08 | 1999 | MINIMIZE WATER USAGE | $6,136 | $10,000 | Not Implemented |
WI0348 # 01 Y:1999 | 01 | 1999 | ELIMINATE SHIFT | $28,000 | $40,000 | Implemented |
WI0348 # 02 Y:1999 | 02 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,083 | $0 | Not Implemented |
WI0348 # 03 Y:1999 | 03 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $4,913 | $18,000 | Not Implemented |
WI0348 # 04 Y:1999 | 04 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,867 | $4,200 | Implemented |
WI0348 # 05 Y:1999 | 05 | 1999 | USE A RAG RECYCLE SERVICE | $843 | $0 | Not Implemented |
WI0348 # 06 Y:1999 | 06 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $756 | $142 | Not Implemented |
WI0348 # 07 Y:1999 | 07 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $229 | $60 | Implemented |
AR0162 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,102 | $270 | Not Implemented |
AR0162 # 02 Y:1999 | 02 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $636 | $952 | Implemented |
AR0162 # 03 Y:1999 | 03 | 1999 | INSULATE BARE EQUIPMENT | $3,144 | $3,881 | Not Implemented |
AR0162 # 04 Y:1999 | 04 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $27,490 | $5,600 | Not Implemented |
AR0162 # 05 Y:1999 | 05 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $29,203 | $0 | Implemented |
AR0162 # 06 Y:1999 | 06 | 1999 | INCREASE USE OF AUTOMATION | $29,203 | $25,000 | Implemented |
WV0164 # 01 Y:1999 | 01 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,403 | $675 | Implemented |