IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,115

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0222 # 06 Y:1999 06 1999 CONVERT TO ELECTROSTATIC POWDER COATING $32,230 $13,000 Not Implemented
UL0222 # 07 Y:1999 07 1999 REDUCE OR ELIMINATE WASTE $55,904 $285,000 Not Implemented
UL0222 # 08 Y:1999 08 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $53,880 $0 Implemented
MA0440 # 01 Y:1999 01 1999 CHANGE OPERATING CONDITIONS $29,415 $130,900 Not Implemented
MA0440 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,896 $15,790 Implemented
MA0440 # 03 Y:1999 03 1999 CHANGE OPERATING CONDITIONS $2,562 $27,140 Not Implemented
MA0440 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,444 $3,400 Implemented
MA0440 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $3,278 $5,204 Implemented
MA0440 # 06 Y:1999 06 1999 RECOVER WASTE HEAT FROM EQUIPMENT $12,349 $70,000 Not Implemented
MA0440 # 07 Y:1999 07 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $709 $1,245 Implemented
MA0440 # 08 Y:1999 08 1999 MINIMIZE WATER USAGE $6,136 $10,000 Not Implemented
WI0348 # 01 Y:1999 01 1999 ELIMINATE SHIFT $28,000 $40,000 Implemented
WI0348 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,083 $0 Not Implemented
WI0348 # 03 Y:1999 03 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $4,913 $18,000 Not Implemented
WI0348 # 04 Y:1999 04 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,867 $4,200 Implemented
WI0348 # 05 Y:1999 05 1999 USE A RAG RECYCLE SERVICE $843 $0 Not Implemented
WI0348 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $756 $142 Not Implemented
WI0348 # 07 Y:1999 07 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $229 $60 Implemented
AR0162 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,102 $270 Not Implemented
AR0162 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $636 $952 Implemented
AR0162 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $3,144 $3,881 Not Implemented
AR0162 # 04 Y:1999 04 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $27,490 $5,600 Not Implemented
AR0162 # 05 Y:1999 05 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $29,203 $0 Implemented
AR0162 # 06 Y:1999 06 1999 INCREASE USE OF AUTOMATION $29,203 $25,000 Implemented
WV0164 # 01 Y:1999 01 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,403 $675 Implemented