Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,115
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ND0230 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,125 | $1,088 | Not Implemented |
ND0230 # 05 Y:1995 | 05 | 1995 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $564 | $650 | Implemented |
ND0230 # 06 Y:1995 | 06 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $57 | $450 | Not Implemented |
WI0245 # 01 Y:1995 | 01 | 1995 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,645 | $10,000 | Not Implemented |
WI0245 # 02 Y:1995 | 02 | 1995 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,239 | $2,000 | Implemented |
WI0245 # 03 Y:1995 | 03 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $722 | $1,946 | Implemented |
WI0245 # 04 Y:1995 | 04 | 1995 | INSTALL OCCUPANCY SENSORS | $141 | $300 | Not Implemented |
WI0245 # 05 Y:1995 | 05 | 1995 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $720 | $700 | Not Implemented |
WI0245 # 06 Y:1995 | 06 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $351 | $1,000 | Implemented |
WI0245 # 07 Y:1995 | 07 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $137 | $100 | Implemented |
WI0245 # 08 Y:1995 | 08 | 1995 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $283 | $0 | Not Implemented |
WI0245 # 09 Y:1995 | 09 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $518 | $0 | Implemented |
WI0245 # 10 Y:1995 | 10 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $119 | $0 | Implemented |
AS0157 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,042 | $11,866 | Not Implemented |
AS0157 # 02 Y:1995 | 02 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,294 | $1,741 | Not Implemented |
AS0157 # 03 Y:1995 | 03 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $944 | $0 | Implemented |
AS0157 # 04 Y:1995 | 04 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,618 | $550 | Implemented |
AS0157 # 05 Y:1995 | 05 | 1995 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,897 | $0 | Not Implemented |
AS0157 # 06 Y:1995 | 06 | 1995 | INSULATE BARE EQUIPMENT | $953 | $658 | Not Implemented |
AS0157 # 07 Y:1995 | 07 | 1995 | INSTALL TIMERS AND/OR THERMOSTATS | $248 | $600 | Implemented |
AS0157 # 08 Y:1995 | 08 | 1995 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,816 | $4,950 | Not Implemented |
AS0157 # 09 Y:1995 | 09 | 1995 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $758 | $2,100 | Implemented |
BD0035 # 01 Y:1995 | 01 | 1995 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $19,345 | $11,900 | Implemented |
BD0035 # 02 Y:1995 | 02 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,483 | $3,900 | Not Implemented |
BD0035 # 03 Y:1995 | 03 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $997 | $1,279 | Not Implemented |