IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

499

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0035 # 05 Y:1995 05 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $112 $100 Not Implemented
BD0035 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $140 $110 Not Implemented
BD0035 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $202 $200 Not Implemented
BD0031 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,441 $3,710 Not Implemented
BD0031 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,068 $420 Implemented
BD0031 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $234 $346 Implemented
BD0031 # 04 Y:1995 04 1995 INSTALL OCCUPANCY SENSORS $529 $150 Not Implemented
BD0031 # 05 Y:1995 05 1995 SHUT OFF PILOTS IN STANDBY EQUIPMENT $87 $20 Implemented
BD0031 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $1,936 $581 Not Implemented
BD0031 # 07 Y:1995 07 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,529 $10,500 Not Implemented
BD0031 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,569 $600 Implemented
WI0238 # 01 Y:1995 01 1995 INSTALL EFFICIENT RECTIFIERS $68,726 $81,000 Not Implemented
WI0238 # 02 Y:1995 02 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,411 $2,500 Not Implemented
WI0238 # 03 Y:1995 03 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,134 $1,400 Not Implemented
WI0238 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,493 $6,600 Not Implemented
WI0238 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $384 $880 Not Implemented
WI0238 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,441 $180 Not Implemented
MO0138 # 01 Y:1995 01 1995 PAY UTILITY BILLS ON TIME $40,772 $0 Implemented
MO0138 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,269 $848 Implemented
MO0138 # 03 Y:1995 03 1995 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $19,282 $4,373 Not Implemented
MO0138 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,554 $46,209 Implemented
MO0138 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,489 $4,070 Not Implemented
MO0138 # 06 Y:1995 06 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,397 $3,220 Not Implemented
MO0138 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,389 $16,600 Implemented
MO0138 # 08 Y:1995 08 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,657 $536 Implemented