IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,115

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0116 # 02 Y:1991 02 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,716 $0 Implemented
RU0116 # 03 Y:1991 03 1991 IMPROVE LUBRICATION PRACTICES $1,334 $800 Implemented
MA0213 # 01 Y:1991 01 1991 AIR CONDITION ONLY SPACE NECESSARY $2,708 $7,000 Not Implemented
MA0213 # 02 Y:1991 02 1991 REPAIR OR REPLACE STEAM TRAPS $2,582 $0 Not Implemented
MA0213 # 03 Y:1991 03 1991 INSTALL TIMERS AND/OR THERMOSTATS $246 $212 Not Implemented
MA0213 # 04 Y:1991 04 1991 RECOVER WASTE HEAT FROM EQUIPMENT $911 $485 Not Implemented
MA0213 # 05 Y:1991 05 1991 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $11,500 $0 Not Implemented
MA0213 # 06 Y:1991 06 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,024 $241 Not Implemented
MA0213 # 07 Y:1991 07 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,097 $0 Not Implemented
MA0213 # 08 Y:1991 08 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,983 $0 Not Implemented
RU0111 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,414 $0 Implemented
RU0111 # 02 Y:1991 02 1991 IMPROVE LUBRICATION PRACTICES $5,665 $800 Implemented
RU0111 # 03 Y:1991 03 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,080 $8,122 Implemented
RU0111 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,330 $340 Implemented
RU0111 # 05 Y:1991 05 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $475 $0 Implemented
UD0339 # 01 Y:1991 01 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,489 $0 Implemented
UD0339 # 02 Y:1991 02 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,089 $0 Implemented
UD0339 # 03 Y:1991 03 1991 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $678 $5,000 Implemented
KU0333 # 01 Y:1991 01 1991 REDESIGN PROCESS $1,119 $0 Implemented
KU0333 # 02 Y:1991 02 1991 INSTALL TIMERS AND/OR THERMOSTATS $3,551 $3,600 Implemented
KU0333 # 03 Y:1991 03 1991 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,970 $20,000 Implemented
KU0333 # 04 Y:1991 04 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,825 $4,000 Implemented
KU0333 # 05 Y:1991 05 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $153 $0 Implemented
KU0333 # 06 Y:1991 06 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,398 $200 Implemented
KU0333 # 07 Y:1991 07 1991 INSTALL SET-BACK TIMERS $698 $1,000 Implemented