IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

122

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0062 # 01 Y:2011 01 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,242 $1,160 Implemented
MZ0062 # 13 Y:2011 13 2011 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $91 $300 Implemented
MZ0062 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $26,441 $1,300 Implemented
MZ0062 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,772 $49,280 Implemented
MZ0062 # 06 Y:2011 06 2011 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $89,844 $250,000 Not Implemented
MZ0062 # 04 Y:2011 04 2011 INSTALL SPECTRAL REFLECTORS / DELAMP $1,360 $100 Implemented
MZ0062 # 08 Y:2011 08 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,105 $15,000 Implemented
MZ0062 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $1,292 $1,840 Not Implemented
MZ0062 # 05 Y:2011 05 2011 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $866 $1,498 Not Implemented
MZ0024 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,506 $5,600 Not Implemented
MZ0024 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,181 $32,800 Implemented
MZ0024 # 03 Y:2008 03 2008 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $828 $370 Not Implemented
MZ0024 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $764 $900 Implemented
MZ0024 # 05 Y:2008 05 2008 USE OPTIMUM THICKNESS INSULATION $430 $800 Not Implemented
BD0304 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,468 $1,200 Not Implemented
BD0304 # 11 Y:2006 11 2006 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $471 $300 Not Implemented
BD0304 # 10 Y:2006 10 2006 USE PHOTOCELL CONTROLS $365 $575 Not Implemented
BD0304 # 09 Y:2006 09 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $495 $1,210 Not Implemented
BD0304 # 08 Y:2006 08 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,235 $4,000 Not Implemented
BD0304 # 07 Y:2006 07 2006 USE RADIANT HEATER FOR SPOT HEATING $11,248 $15,050 Not Implemented
BD0304 # 06 Y:2006 06 2006 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $17,742 $13,293 Not Implemented
BD0304 # 05 Y:2006 05 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $24,840 $24,000 Not Implemented
BD0304 # 04 Y:2006 04 2006 AUTOMATE FINISHING PROCESS $238,680 $320,000 Not Implemented
BD0304 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $330 $0 Not Implemented
BD0304 # 02 Y:2006 02 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,428 $1,000 Not Implemented