Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

110

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0335 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $67,090 $3,825 Not Implemented
LE0335 # 03 Y:2012 03 2012 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $19,961 $32,500 Not Implemented
LE0335 # 04 Y:2012 04 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $15,946 $9,800 Not Implemented
LE0335 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,640 $1,000 Not Implemented
LE0335 # 06 Y:2012 06 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,534 $3,000 Not Implemented
LE0335 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,018 $44,640 Not Implemented
LE0277 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,555 $3,555 Not Implemented
LE0277 # 08 Y:2008 08 2008 USE SOLAR HEAT TO HEAT WATER $354 $1,260 Not Implemented
LE0277 # 07 Y:2008 07 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $884 $800 Not Implemented
LE0277 # 06 Y:2008 06 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,194 $2,500 Not Implemented
LE0277 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,432 $200 Not Implemented
LE0277 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,656 $130 Not Implemented
LE0277 # 03 Y:2008 03 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,444 $500 Not Implemented
LE0277 # 02 Y:2008 02 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,354 $15,000 Not Implemented
LE0277 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,555 $1,000 Not Implemented
LE0277 # 10 Y:2008 10 2008 INSTALL OCCUPANCY SENSORS $755 $60 Not Implemented
LE0242 # 01 Y:2006 01 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $734,219 $1,251,036 Implemented
LE0242 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $22,987 $20,000 Implemented
LE0242 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,843 $1,000 Implemented
LE0242 # 05 Y:2006 05 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,240 $6,400 Implemented
LE0242 # 06 Y:2006 06 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,001 $2,000 Implemented
LE0242 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $996 $1,000 Implemented
LE0242 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $152 $75 Implemented
LE0242 # 09 Y:2006 09 2006 INSTALL OCCUPANCY SENSORS $651 $450 Not Implemented
LE0242 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,990 $8,750 Implemented