Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,185
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0160 # 03 Y:1985 | 03 | 1985 | USE RADIANT HEATER FOR SPOT HEATING | $2,869 | $5,000 | Not Implemented |
OK0160 # 04 Y:1985 | 04 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $386 | $500 | Not Implemented |
OK0162 # 01 Y:1985 | 01 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $6,361 | $1,022 | Not Implemented |
OK0162 # 02 Y:1985 | 02 | 1985 | OPTIMIZE PLANT POWER FACTOR | $900 | $2,355 | Not Implemented |
OK0162 # 03 Y:1985 | 03 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $799 | $400 | Not Implemented |
OK0162 # 04 Y:1985 | 04 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $146 | $310 | Not Implemented |
OK0162 # 05 Y:1985 | 05 | 1985 | REDESIGN PROCESS | $529 | $33 | Not Implemented |
OK0162 # 06 Y:1985 | 06 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,273 | $10,000 | Not Implemented |
CO0021 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $474 | $219 | Implemented |
CO0021 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $440 | $500 | Implemented |
CO0021 # 03 Y:1985 | 03 | 1985 | INSULATE BARE EQUIPMENT | $811 | $200 | Implemented |
CO0021 # 04 Y:1985 | 04 | 1985 | INSULATE BARE EQUIPMENT | $149 | $200 | Implemented |
CO0021 # 05 Y:1985 | 05 | 1985 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $2,675 | $0 | Implemented |
CO0021 # 06 Y:1985 | 06 | 1985 | REDUCE LOAD ON ELECTRICAL CONDUCTOR TO REDUCE HEATING LOSSES | $3,907 | $1,000 | Not Implemented |
CO0021 # 07 Y:1985 | 07 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $532 | $500 | Implemented |
CO0021 # 08 Y:1985 | 08 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $327 | $50 | Implemented |
CO0021 # 09 Y:1985 | 09 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $174 | $100 | Implemented |
CO0021 # 10 Y:1985 | 10 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $467 | $100 | Implemented |
GT0249 # 01 Y:1985 | 01 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,317 | $500 | Implemented |
GT0249 # 02 Y:1985 | 02 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $940 | $277 | Implemented |
GT0249 # 03 Y:1985 | 03 | 1985 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $218 | $585 | Not Implemented |
GT0249 # 04 Y:1985 | 04 | 1985 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $277 | $150 | Implemented |
PV0002 # 01 Y:1985 | 01 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $375 | $79 | Not Implemented |
PV0002 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,792 | $10 | Not Implemented |
PV0002 # 03 Y:1985 | 03 | 1985 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,393 | $0 | Not Implemented |