IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

203

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0441 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,450 $3,480 Implemented
UM0441 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,664 $2,500 Implemented
UM0441 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,700 $14,400 Not Implemented
UM0441 # 01 Y:2014 01 2014 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $73,169 $180,000 Not Implemented
IP0020 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,300 $0 Implemented
IP0020 # 02 Y:2013 02 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,348 $0 Not Implemented
IP0020 # 03 Y:2013 03 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,778 $0 Not Implemented
IP0020 # 04 Y:2013 04 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $1,410 $0 Not Implemented
IP0020 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $4,867 $625 Not Implemented
IP0020 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,216 $699 Implemented
IP0020 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $306 $58 Not Implemented
IP0020 # 08 Y:2013 08 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $824 $176 Implemented
IC0107 # 02 Y:2005 02 2005 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $93,103 $4,926 Not Implemented
IC0107 # 12 Y:2005 12 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,508 $608 Not Implemented
IC0107 # 01 Y:2005 01 2005 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $9,504 $19,598 Not Implemented
IC0107 # 03 Y:2005 03 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,772 $39,896 Not Implemented
IC0107 # 04 Y:2005 04 2005 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $19,487 $61,560 Not Implemented
IC0107 # 05 Y:2005 05 2005 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $13,232 $0 Not Implemented
IC0107 # 06 Y:2005 06 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $22,485 $224,000 Not Implemented
IC0107 # 08 Y:2005 08 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $358 $262 Not Implemented
IC0107 # 13 Y:2005 13 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,035 $4,016 Not Implemented
IC0107 # 11 Y:2005 11 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,097 $9,021 Not Implemented
IC0107 # 10 Y:2005 10 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,309 $0 Not Implemented
IC0107 # 09 Y:2005 09 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,560 $1,800 Not Implemented
IC0107 # 07 Y:2005 07 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $799,427 $750,000 Not Implemented