IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,111

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0327 # 05 Y:2010 05 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $127 $160 Not Implemented
UM0363 # 01 Y:2010 01 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,083 $500 Implemented
UM0363 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $9,498 $10,000 Implemented
UM0363 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $7,516 $500 Not Implemented
UM0363 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,792 $200 Not Implemented
UM0363 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,241 $1,000 Implemented
UM0363 # 06 Y:2010 06 2010 INSULATE BARE EQUIPMENT $2,173 $1,375 Implemented
UM0363 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $542 $1,568 Implemented
AM0566 # 01 Y:2009 01 2009 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $59,200 $0 Not Implemented
AM0566 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,230 $111,190 Implemented
AM0566 # 03 Y:2009 03 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $35,170 $1,300 Implemented
AM0566 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,100 $3,000 Implemented
AM0566 # 05 Y:2009 05 2009 USE SYNTHETIC LUBRICANT $6,890 $0 Implemented
AM0566 # 06 Y:2009 06 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $4,000 $0 Not Implemented
AM0566 # 07 Y:2009 07 2009 INSTALL SKYLIGHTS $2,100 $2,730 Not Implemented
AM0566 # 08 Y:2009 08 2009 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,950 $0 Implemented
AM0566 # 09 Y:2009 09 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $1,780 $0 Implemented
AM0566 # 10 Y:2009 10 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,385 $380 Implemented
WV0398 # 01 Y:2009 01 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $413,866 $803,660 Not Implemented
WV0398 # 02 Y:2009 02 2009 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $165,791 $85,600 Not Implemented
WV0398 # 03 Y:2009 03 2009 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $97,378 $120,000 Not Implemented
WV0398 # 04 Y:2009 04 2009 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $75,243 $72,000 Not Implemented
WV0398 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,098 $44,783 Not Implemented
WV0398 # 06 Y:2009 06 2009 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $11,848 $3,759 Not Implemented
WV0398 # 07 Y:2009 07 2009 DEVELOP A REPAIR/REPLACE POLICY $11,204 $793 Implemented