IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,226

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0378 # 07 Y:2008 07 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,424 $1,290 Implemented
WV0378 # 08 Y:2008 08 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $117 $206 Implemented
MS0329 # 01 Y:2008 01 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $172,142 $1,000 Not Implemented
MS0329 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,660 $8,899 Not Implemented
MS0329 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,458 $256 Not Implemented
MS0329 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,327 $7,955 Not Implemented
MS0329 # 05 Y:2008 05 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $844 $1,500 Not Implemented
MS0329 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $500 $912 Not Implemented
SU0266 # 01 Y:2008 01 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,391 $0 Not Implemented
SU0266 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,817 $0 Not Implemented
SU0266 # 03 Y:2008 03 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,166 $0 Implemented
SU0266 # 04 Y:2008 04 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $151,996 $23,800 Not Implemented
SU0266 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,953 $339 Implemented
SU0266 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,096 $424 Implemented
SU0266 # 07 Y:2008 07 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $114 $65 Not Implemented
SU0266 # 08 Y:2008 08 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,220 $40,650 Not Implemented
SU0266 # 09 Y:2008 09 2008 INSTALL OCCUPANCY SENSORS $100 $626 Not Implemented
BD0344 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,551 $474 Not Implemented
BD0344 # 02 Y:2008 02 2008 USE PHOTOCELL CONTROLS $3,786 $991 Not Implemented
BD0344 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,657 $1,021 Not Implemented
BD0344 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,483 $101 Not Implemented
BD0344 # 05 Y:2008 05 2008 RECOVER WASTE HEAT FROM EQUIPMENT $75,203 $20,001 Not Implemented
BD0344 # 06 Y:2008 06 2008 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $15,215 $7,501 Not Implemented
BD0344 # 07 Y:2008 07 2008 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $43,004 $11,201 Not Implemented
BD0344 # 08 Y:2008 08 2008 USE RADIANT HEATER FOR SPOT HEATING $16,854 $27,001 Not Implemented