IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,115

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0688 # 17 Y:2004 17 2004 REDUCE VENTILATION AIR $1,805 $73 Not Implemented
UD0688 # 18 Y:2004 18 2004 INSULATE BARE EQUIPMENT $880 $1,820 Implemented
LL0179 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,033 $2,120 Implemented
LL0179 # 02 Y:2004 02 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,974 $5,700 Not Implemented
LL0179 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $1,743 $777 Not Implemented
LL0179 # 04 Y:2004 04 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,680 $235 Not Implemented
LL0179 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $1,051 $270 Not Implemented
LL0179 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $427 $15 Implemented
LL0179 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $372 $245 Implemented
LL0179 # 08 Y:2004 08 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $313 $230 Implemented
LL0179 # 09 Y:2004 09 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $726 $629 Implemented
WI0455 # 01 Y:2003 01 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $17,710 $2,500 Implemented
WI0455 # 02 Y:2003 02 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $12,503 $2,000 Not Implemented
WI0455 # 03 Y:2003 03 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,687 $1,000 Not Implemented
WI0455 # 04 Y:2003 04 2003 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $1,787 $0 Not Implemented
WI0455 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,232 $1,240 Not Implemented
WI0455 # 06 Y:2003 06 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $716 $0 Not Implemented
LE0173 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $37,011 $0 Not Implemented
LE0173 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $32,033 $0 Not Implemented
LE0173 # 03 Y:2003 03 2003 PAY UTILITY BILLS ON TIME $14,409 $0 Not Implemented
LE0173 # 04 Y:2003 04 2003 PAY UTILITY BILLS ON TIME $10,900 $0 Not Implemented
LE0173 # 05 Y:2003 05 2003 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $6,047 $10,000 Not Implemented
LE0173 # 06 Y:2003 06 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,247 $750 Not Implemented
LE0173 # 07 Y:2003 07 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,069 $0 Not Implemented
BD0243 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,372 $2,000 Not Implemented