IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0546 # 07 Y:2015 07 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $229 $371 Implemented
IA0546 # 06 Y:2015 06 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $419 $539 Implemented
IA0546 # 05 Y:2015 05 2015 SHUT OFF PILOTS IN STANDBY EQUIPMENT $814 $60 Implemented
IA0546 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,230 $463 Implemented
IA0546 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,451 $5,839 Implemented
IA0546 # 02 Y:2015 02 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,907 $7,104 Implemented
IA0546 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,361 $6,263 Implemented
IA0364 # 11 Y:2005 11 2005 USE EVAPORATION TO CONCENTRATE MATERIAL $18,149 $1,500 Not Implemented
IA0364 # 14 Y:2005 14 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $106,060 $8,250 Not Implemented
IA0364 # 13 Y:2005 13 2005 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $31,486 $50,000 Not Implemented
IA0364 # 12 Y:2005 12 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,870 $1,000 Not Implemented
IA0364 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,080 $1,210 Not Implemented
IA0364 # 10 Y:2005 10 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $26,250 $650 Not Implemented
IA0364 # 09 Y:2005 09 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,040 $640 Not Implemented
IA0364 # 08 Y:2005 08 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,562 $425 Not Implemented
IA0364 # 07 Y:2005 07 2005 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $37,500 $15,000 Not Implemented
IA0364 # 06 Y:2005 06 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $6,250 $1,800 Not Implemented
IA0364 # 05 Y:2005 05 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,078 $900 Not Implemented
IA0364 # 04 Y:2005 04 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,547 $8,960 Not Implemented
IA0364 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,554 $6,744 Not Implemented
IA0364 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,156 $6,174 Not Implemented