IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

62

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2319 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $123,311 $1,196,880 n/a
KS2319 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,663 $19,796 n/a
KS2319 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $307 $119 n/a
KS2319 # 03 Y:2023 03 2023 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $2,009 $5,440 n/a
KS2319 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,385 $5,960 n/a
KS2319 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $593 $60 n/a
CL2103 # 02 Y:2021 02 2021 PAY UTILITY BILLS ON TIME $812 $0 Implemented
CL2103 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,209 $27,253 Not Implemented
CL2103 # 06 Y:2021 06 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,015 $0 Not Implemented
CL2103 # 05 Y:2021 05 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $349 $520 Implemented
CL2103 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,873 $15,000 Not Implemented
CL2103 # 03 Y:2021 03 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $69,803 $0 Implemented
NC0523 # 05 Y:2014 05 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $8,560 $2,500 Not Implemented
NC0523 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $176 $200 Implemented
NC0523 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $944 $3,012 Implemented
NC0523 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,419 $146,762 Not Implemented
NC0523 # 03 Y:2014 03 2014 REPLACE BOILER $58,620 $90,000 Not Implemented
NC0523 # 02 Y:2014 02 2014 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $78,330 $120,000 Not Implemented
NC0523 # 11 Y:2014 11 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,120 $1,000 Implemented
NC0523 # 09 Y:2014 09 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,387 $20,000 Not Implemented
NC0523 # 01 Y:2014 01 2014 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $156,000 $600,000 Not Implemented
NC0523 # 10 Y:2014 10 2014 RECOVER WASTE HEAT FROM EQUIPMENT $14,411 $12,000 Not Implemented
NC0523 # 12 Y:2014 12 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,179 $50 Implemented
NC0523 # 13 Y:2014 13 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,803 $1,935 Implemented
NC0523 # 08 Y:2014 08 2014 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $11,195 $20,000 Not Implemented