Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

164

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0172 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,307 $309 Implemented
MS0172 # 03 Y:2000 03 2000 INSTALL TIMERS AND/OR THERMOSTATS $624 $708 Implemented
MS0172 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $66 $151 Not Implemented
MS0172 # 04 Y:2000 04 2000 SHUT OFF PILOTS IN STANDBY EQUIPMENT $346 $40 Implemented
MS0172 # 07 Y:2000 07 2000 $9,009 $7,649 Implemented
MS0172 # 01 Y:2000 01 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,027 $1,383 Not Implemented
MS0172 # 05 Y:2000 05 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $951 $100 Not Implemented
KU0550 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,038 $20 Not Implemented
KU0550 # 01 Y:2000 01 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $8,989 $17,000 Not Implemented
KU0550 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,255 $650 Not Implemented
KU0550 # 04 Y:2000 04 2000 $101,920 $34,000 Not Implemented
KU0550 # 05 Y:2000 05 2000 $40,768 $5,000 Not Implemented
ND0364 # 06 Y:2000 06 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $75 $200 Implemented
ND0364 # 07 Y:2000 07 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $605 $400 Not Implemented
ND0364 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $839 $600 Not Implemented
ND0364 # 05 Y:2000 05 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,221 $1,000 Not Implemented
ND0364 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $271 $575 Implemented
ND0364 # 02 Y:2000 02 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,206 $0 Implemented
ND0364 # 01 Y:2000 01 2000 DEVELOP A REPAIR/REPLACE POLICY $8,340 $22,377 Implemented
ND0364 # 08 Y:2000 08 2000 MINIMIZE WATER USAGE $821 $2,875 Not Implemented
MA0470 # 05 Y:2000 05 2000 UPGRADE CONTROLS ON COMPRESSORS $1,402 $280 Implemented
MA0470 # 02 Y:2000 02 2000 USE RADIANT HEATER FOR SPOT HEATING $3,064 $12,000 Not Implemented
MA0470 # 03 Y:2000 03 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,099 $4,500 Not Implemented
MA0470 # 01 Y:2000 01 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,970 $500 Implemented
MA0470 # 07 Y:2000 07 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $206 $450 Implemented