Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
177
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0192 # 03 Y:2001 | 03 | 2001 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,056 | $50 | Implemented |
MS0192 # 04 Y:2001 | 04 | 2001 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $13,924 | $510 | Not Implemented |
MS0192 # 05 Y:2001 | 05 | 2001 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,153 | $3,127 | Implemented |
MS0192 # 02 Y:2001 | 02 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,993 | $1,000 | Implemented |
MS0192 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,415 | $443 | Implemented |
IC0020 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $488 | $0 | Implemented |
IC0020 # 06 Y:2001 | 06 | 2001 | AUTOMATE PAYROLL SYSTEM | $11,000 | $4,748 | Not Implemented |
IC0020 # 05 Y:2001 | 05 | 2001 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $3,154 | $0 | Not Implemented |
IC0020 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,536 | $1,800 | Implemented |
IC0020 # 03 Y:2001 | 03 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $325 | $735 | Implemented |
IC0020 # 04 Y:2001 | 04 | 2001 | INSTALL SET-BACK TIMERS | $2,895 | $580 | Not Implemented |
SU0119 # 03 Y:2001 | 03 | 2001 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $5,956 | $4,900 | Implemented |
LL0118 # 06 Y:2001 | 06 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $15,884 | $456 | Implemented |
SU0119 # 07 Y:2001 | 07 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $2,456 | $0 | Implemented |
SU0119 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $930 | $0 | Implemented |
SU0119 # 01 Y:2001 | 01 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,410 | $0 | Not Implemented |
SU0119 # 06 Y:2001 | 06 | 2001 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $46,417 | $15,500 | Not Implemented |
SU0119 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $30,661 | $208,950 | Not Implemented |
LL0118 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,379 | $2,190 | Implemented |
SU0119 # 04 Y:2001 | 04 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,095 | $727 | Implemented |
LL0118 # 01 Y:2001 | 01 | 2001 | OPTIMIZE PLANT POWER FACTOR | $53,505 | $55,889 | Not Implemented |
LL0118 # 02 Y:2001 | 02 | 2001 | INSTALL OCCUPANCY SENSORS | $10,056 | $297 | Implemented |
LL0118 # 04 Y:2001 | 04 | 2001 | USE POWER DURING OFF-PEAK PERIODS | $18,618 | $0 | Not Implemented |
LL0118 # 05 Y:2001 | 05 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $36,180 | $0 | Implemented |
WI0406 # 01 Y:2001 | 01 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $8,841 | $0 | Implemented |