Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
145
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0029 # 03 Y:2014 | 03 | 2014 | INSTALL OCCUPANCY SENSORS | $980 | $122 | Not Implemented |
IP0029 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,383 | $92 | Not Implemented |
IP0029 # 01 Y:2014 | 01 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,363 | $210 | Not Implemented |
IP0029 # 08 Y:2014 | 08 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,953 | $54,929 | Implemented |
IP0029 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,432 | $4,014 | Implemented |
IP0029 # 06 Y:2014 | 06 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,419 | $512 | Not Implemented |
IP0029 # 04 Y:2014 | 04 | 2014 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $82,707 | $12,435 | Not Implemented |
IP0029 # 05 Y:2014 | 05 | 2014 | INSULATE BARE EQUIPMENT | $2,997 | $1,104 | Not Implemented |
MA0736 # 05 Y:2014 | 05 | 2014 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,360 | $500 | Implemented |
MA0736 # 02 Y:2014 | 02 | 2014 | OPTIMIZE PLANT POWER FACTOR | $14,457 | $14,774 | Implemented |
MA0736 # 04 Y:2014 | 04 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,218 | $4,000 | Implemented |
MA0736 # 08 Y:2014 | 08 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $655 | $500 | Not Implemented |
MA0736 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,138 | $109,865 | Implemented |
MA0736 # 06 Y:2014 | 06 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,069 | $6,500 | Not Implemented |
MA0736 # 03 Y:2014 | 03 | 2014 | REDUCE VENTILATION AIR | $7,297 | $2,550 | Not Implemented |
MA0736 # 07 Y:2014 | 07 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,318 | $4,000 | Implemented |
NC0523 # 02 Y:2014 | 02 | 2014 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $78,330 | $120,000 | Not Implemented |
NC0523 # 01 Y:2014 | 01 | 2014 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $156,000 | $600,000 | Not Implemented |
NC0523 # 03 Y:2014 | 03 | 2014 | REPLACE BOILER | $58,620 | $90,000 | Not Implemented |
NC0523 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,419 | $146,762 | Not Implemented |
NC0523 # 05 Y:2014 | 05 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $8,560 | $2,500 | Not Implemented |
NC0523 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $944 | $3,012 | Implemented |
NC0523 # 07 Y:2014 | 07 | 2014 | INSTALL OCCUPANCY SENSORS | $176 | $200 | Implemented |
NC0523 # 08 Y:2014 | 08 | 2014 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $11,195 | $20,000 | Not Implemented |
NC0523 # 09 Y:2014 | 09 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,387 | $20,000 | Not Implemented |