Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
75
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0208 # 02 Y:2018 | 02 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $18,213 | $1,050 | Not Implemented |
IC0208 # 03 Y:2018 | 03 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,005 | $9,970 | Not Implemented |
IC0208 # 04 Y:2018 | 04 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $12,442 | $24,500 | Not Implemented |
IC0208 # 05 Y:2018 | 05 | 2018 | REPLACE DIRECT FIRED WITH STEAM HEAT | $12,205 | $25,158 | Not Implemented |
IC0208 # 01 Y:2018 | 01 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,360 | $0 | Not Implemented |
MA0794 # 05 Y:2018 | 05 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $710 | $2,583 | Not Implemented |
MA0794 # 04 Y:2018 | 04 | 2018 | INSTALL TIMERS AND/OR THERMOSTATS | $1,216 | $852 | Implemented |
MA0794 # 03 Y:2018 | 03 | 2018 | INSULATE BARE EQUIPMENT | $2,123 | $4,092 | Not Implemented |
MA0794 # 02 Y:2018 | 02 | 2018 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $14,204 | $51,700 | Not Implemented |
MA0794 # 01 Y:2018 | 01 | 2018 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $84,640 | $121,500 | Implemented |
WV0565 # 01 Y:2018 | 01 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $81,443 | $80,480 | Not Implemented |
WV0565 # 04 Y:2018 | 04 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $2,854 | $533 | Implemented |
WV0565 # 06 Y:2018 | 06 | 2018 | INSULATE BARE EQUIPMENT | $810 | $1,600 | Implemented |
WV0565 # 05 Y:2018 | 05 | 2018 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,441 | $500 | Implemented |
WV0565 # 08 Y:2018 | 08 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $704 | $40 | Implemented |
WV0565 # 03 Y:2018 | 03 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $17,434 | $68,000 | Not Implemented |
WV0565 # 07 Y:2018 | 07 | 2018 | USE EVAPORATION TO CONCENTRATE MATERIAL | $733 | $1,750 | Not Implemented |
WV0565 # 02 Y:2018 | 02 | 2018 | INSTALL OCCUPANCY SENSORS | $77,310 | $17,740 | Implemented |
LE0460 # 01 Y:2018 | 01 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $650 | $40 | Not Implemented |
LE0460 # 02 Y:2018 | 02 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $508 | $1,000 | Not Implemented |
LE0460 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,239 | $14,500 | Not Implemented |
LE0460 # 04 Y:2018 | 04 | 2018 | REPLACE BOILER | $6,378 | $28,000 | Not Implemented |
LE0460 # 05 Y:2018 | 05 | 2018 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,333 | $19,000 | Not Implemented |
NC0619 # 02 Y:2018 | 02 | 2018 | INSTALL OCCUPANCY SENSORS | $211 | $350 | Implemented |
NC0619 # 09 Y:2018 | 09 | 2018 | AVOID REWINDING MOTORS MORE THAN TWICE | $3,477 | $5,865 | Implemented |