IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

462

matching recommendations
Reset
SIC 3491 Industrial Valves
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0554 # 06 Y:2024 06 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,419 $54 n/a
SU0554 # 04 Y:2024 04 2024 DISCONNECT BALLASTS $25 $0 n/a
SU0554 # 01 Y:2024 01 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $19,596 $0 n/a
SU0554 # 09 Y:2024 09 2024 USE HEAT PUMP FOR SPACE CONDITIONING $12,437 $105,375 n/a
SU0554 # 03 Y:2024 03 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $124 $0 n/a
SU0554 # 02 Y:2024 02 2024 PAY BILLS ON TIME TO AVOID LATE FEES $1,907 $0 n/a
SU0554 # 08 Y:2024 08 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $82,048 $526,750 n/a
SU0554 # 05 Y:2024 05 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,553 $84 n/a
SU0554 # 07 Y:2024 07 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $355 $466 n/a
UA0284 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,762 $8,114 n/a
UA0284 # 05 Y:2024 05 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $479 $500 n/a
UA0284 # 02 Y:2024 02 2024 INSTALL TIMERS AND/OR THERMOSTATS $6,430 $1,437 n/a
UA0284 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,690 $13,427 n/a
UA0284 # 06 Y:2024 06 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $310 $88 n/a
UA0284 # 03 Y:2024 03 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,801 $783 n/a
OK1106 # 06 Y:2024 06 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $122 $602 Not Implemented
OK1106 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $40,554 $187,200 Not Implemented
OK1106 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,422 $50,026 Implemented
OK1106 # 03 Y:2024 03 2024 USE RADIANT HEATER FOR SPOT HEATING $2,649 $5,850 Not Implemented
OK1106 # 05 Y:2024 05 2024 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,777 $4,495 Implemented
OK1106 # 07 Y:2024 07 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $149 $0 Not Implemented
OK1106 # 04 Y:2024 04 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,650 $8,580 Not Implemented
LS2404 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,771 $3,080 Implemented
LS2404 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,054 $135 Implemented
LS2404 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,458 $11,138 Implemented