IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

453

matching recommendations
Reset
SIC 3491 Industrial Valves
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0497 # 10 Y:2021 10 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $152 $287 Implemented
UD1023 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $9,882 $0 Not Implemented
UD1023 # 02 Y:2020 02 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $218 $0 Not Implemented
UD1023 # 03 Y:2020 03 2020 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $163 $0 Not Implemented
UD1023 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $33,329 $14,912 Not Implemented
UD1023 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,341 $0 Not Implemented
UD1023 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,275 $3,000 Not Implemented
UD1023 # 07 Y:2020 07 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $605 $340 Not Implemented
UD1023 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,553 $5,220 Not Implemented
UD1023 # 09 Y:2020 09 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $936 $1,600 Not Implemented
UD1023 # 10 Y:2020 10 2020 INSTALL OCCUPANCY SENSORS $904 $560 Not Implemented
UD1023 # 11 Y:2020 11 2020 REPLACE BOILER $6,824 $18,600 Not Implemented
TR0022 # 01 Y:2020 01 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,078 $0 Not Implemented
TR0022 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,125 $1,000 Implemented
TR0022 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,666 $10,056 Implemented
TR0022 # 04 Y:2020 04 2020 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $204 $102 Implemented
TR0022 # 05 Y:2020 05 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,951 $15,000 Not Implemented
TR0022 # 06 Y:2020 06 2020 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $7,628 $0 Implemented
AM0772 # 09 Y:2019 09 2019 USE SYNTHETIC LUBRICANT $387 $160 Not Implemented
AM0772 # 08 Y:2019 08 2019 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $650 $900 Implemented
AM0772 # 07 Y:2019 07 2019 INSTALL OCCUPANCY SENSORS $365 $770 Implemented
AM0772 # 06 Y:2019 06 2019 PAY UTILITY BILLS ON TIME $3,642 $0 Implemented
AM0772 # 05 Y:2019 05 2019 RECOVER WASTE HEAT FROM EQUIPMENT $2,191 $3,010 Not Implemented
AM0772 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,435 $20 Implemented
AM0772 # 03 Y:2019 03 2019 OPTIMIZE PLANT POWER FACTOR $10,709 $23,380 Not Implemented