IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

371

matching recommendations
Reset
SIC 3492 Fluid Power Valves & Hose Fittings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0035 # 07 Y:1995 07 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $666 $600 Implemented
UF0115 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,197 $919 Implemented
UF0115 # 02 Y:1995 02 1995 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,494 $4,500 Not Implemented
UF0115 # 03 Y:1995 03 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,819 $1,500 Not Implemented
UF0115 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $420 $1,364 Implemented
UF0115 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $111 $183 Implemented
UF0115 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,540 $500 Implemented
UF0108 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $221 $160 Implemented
UF0108 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,776 $4,557 Implemented
UF0108 # 03 Y:1995 03 1995 INSTALL OCCUPANCY SENSORS $6,471 $640 Not Implemented
UF0108 # 04 Y:1995 04 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $37,107 $7,595 Implemented
UF0108 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,516 $9,616 Implemented
UF0108 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,073 $2,000 Implemented
UF0108 # 07 Y:1995 07 1995 USE LESS WASTEFUL PACKAGING $5,803 $0 Not Implemented
UF0108 # 08 Y:1995 08 1995 CONVERT TO AQUEOUS CLEANING SYSTEM $36,907 $18,000 Implemented
AR0044 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,019 $565 Implemented
AR0044 # 02 Y:1994 02 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $588 $385 Implemented
AR0044 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $278 $100 Implemented
AR0044 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $559 $100 Implemented
AR0044 # 05 Y:1994 05 1994 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $196 $20 Implemented
AR0028 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,571 $300 Implemented
AR0028 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,490 $7,600 Implemented
AR0028 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,584 $913 Implemented
AR0028 # 04 Y:1994 04 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,367 $495 Implemented
AR0028 # 05 Y:1994 05 1994 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $37,510 $30,000 Not Implemented